Autoclaved aerated concrete block: large, light and insulating, used for infill and partition walls in framed buildings (IS 2185 Part 3).
Building words, in plain language.
The terms you will meet in deeds, sanction plans, estimates and on site, with their Bengali and Hindi names. Each definition names its source and links to the guide, calculator or Lab tool that goes further.
All 120 terms2 terms match “katha”
A
Building a new floor on an existing house needs a fresh sanction and a structural engineer’s check that the columns and foundation can carry it.
A contract to sell later on agreed terms; it does not transfer ownership. For a flat in a RERA project, the builder cannot take more than 10% of the cost before a registered agreement for sale.
Chemical treatment of the soil at the foundation and plinth stages, before the floor is laid (IS 6313 Part 2). It cannot be done properly once the floor is in.
B
A waterproof coat on the bathroom floor and lower walls before tiling, turned up the walls and taken higher around the shower, then checked by keeping water on the floor for a day or two.
A horizontal member that carries a slab or wall and passes the load to the columns.
20 katha, or 14,400 sq ft, in West Bengal. A bigha is a different size in other states, so check which one a document means.
A list of every item of work with its unit, quantity and rate, measured to IS 1200. When contractors price the same BOQ, their quotes can be compared line by line.
The Block Land and Land Reforms Office, which keeps the land records for a block and handles mutation and land conversion.
Permission from the municipality or development authority to build to a set of drawings. Kolkata follows the KMC Building Rules, 2009; most other towns follow the West Bengal Municipal Building Rules, 2007.
Carpet area plus the walls, and usually the balcony. Sellers count it differently, so check what a quote or agreement includes (IS 3861 gives the measuring rules).
C
A beam or slab held at one end only, such as a balcony or a chajja over a window. Its strength depends on the steel near its top surface and on its fixing into the main structure.
The box of a cabinet or wardrobe, without its doors and drawers. The board it is made from decides how well it stands up to damp.
The usable floor area of a flat inside its walls, leaving out external walls, service shafts, balconies and open terraces (RERA Act, 2016, section 2(k)). Under RERA, flats are sold by carpet area.
A coat of cement and sand on walls and ceilings, commonly 1:4 to 1:6 and about 12–15 mm thick (IS 1661). It needs curing like concrete.
Crushed stone, usually 10–20 mm, that makes up most of concrete. It should be clean, hard and angular, without dust or flaky pieces (IS 383).
How warm or cool white light looks, in kelvin (K): about 2700–3000 K is warm white, around 4000 K neutral, and 5700–6500 K cool daylight.
An upright member that carries the load of beams and slabs down to the foundation. Cracks or exposed steel in a column always need an engineer quickly.
The notice, signed by the professional on record, that the building is finished as sanctioned. The authority inspects the building before it issues the occupancy certificate.
Wiring run in PVC or metal conduits inside walls and slabs (IS 732). Plan the switch and socket points before plastering, because changes later mean cutting walls.
The concrete between the steel bars and the surface, which protects the steel from rust and fire. IS 456 sets minimums by exposure, starting at 20 mm; columns need at least 40 mm.
M followed by the strength in N/mm² that test cubes must reach at 28 days, for example M20 or M25. IS 456 sets M20 as the lowest grade for reinforced concrete, higher in harsher exposure.
An amount kept aside in a budget, often 5–10%, for work that cannot be foreseen, such as hidden damage in an old building or a deeper foundation.
You pay the actual cost of materials and labour, backed by bills, plus an agreed fee or percentage for the contractor.
Small concrete or plastic spacers tied under and beside the steel so it keeps the right cover during the pour.
Concrete from a pour is cast into 150 mm cubes, cured and crushed at 7 and 28 days to check that it reached its grade (IS 516).
Keeping new concrete or plaster damp so the cement keeps hardening. IS 456 asks for at least 7 days with ordinary Portland cement and 10 days with PPC or other blended cements.
D
Tiles taken up the lower part of a wall to protect it from water: often to about 2.1 m in bathrooms and about 600 mm above a kitchen counter.
The plot number on the mouza map. Records can show an older RS dag and a newer LR dag for the same land, so match both.
A waterproof layer at plinth level that stops moisture in the ground from rising into the walls.
One hundredth of an acre: 435.6 sq ft (about 40.5 m²). Land records in rural West Bengal often give plot areas in decimals.
The time after handover, commonly 12 months, in which the contractor must fix defects at no cost. For flats under RERA, the builder must fix structural defects reported within 5 years of possession (section 14(3)).
Any part of a building that differs from the sanctioned plan, such as an extra floor or a smaller setback. It can hold up the occupancy certificate and may have to be removed.
Steel arrangements, such as closely spaced ties with 135° hooks at the ends of beams and columns, that let a frame bend in an earthquake without collapsing (IS 13920:2016).
E
A strip glued over the cut edges of a board to seal them against moisture and chipping.
Equated monthly instalment: the fixed monthly payment that repays a loan and its interest over the loan term.
Water-based paint with an acrylic binder: washable, low in smell, made in separate interior and exterior grades (IS 15489). Primer underneath helps it grip.
A claim on a property, such as a mortgage, a lien or a pending case. Searching the registry records for them is part of a title check.
Approval needed for building projects with 20,000 m² or more of built-up area, under the EIA Notification, 2006.
A forecast of cost. A preliminary estimate uses a rate per sq ft of built-up area; a detailed estimate prices every item in the BOQ.
F
A ceiling hung below the slab on a metal frame, usually of gypsum board (IS 2095), to hide wiring and ducts and to hold lights.
The total floor area allowed on all floors divided by the plot area. It depends on road width, building use and the local rules. Also called FSI.
TMT steel with a yield strength of at least 500 N/mm². The D grade has tighter limits on carbon, sulphur and phosphorus and stretches more before breaking, which helps in earthquakes.
Clearance from West Bengal Fire & Emergency Services. Residential buildings above 14.5 m count as high-rise and need one.
A brick made from power-station fly ash with lime or cement and sand, cured instead of fired. Uniform in size, with a smaller environmental footprint than burnt clay (IS 12894).
The part of a building that spreads its load into the ground. Separate footings under each column suit firm soil; weaker soil needs a raft or piles.
A building held up by an RCC frame of columns, beams and slabs, with walls only filling the gaps. Walls in such a building can often be changed; columns and beams cannot.
G
A hard natural stone (IS 3316) used for kitchen counters, sills, stairs and floors. It resists heat and scratches; lighter granites stain less once sealed.
The share of the plot that the building’s footprint may cover. The rest stays open for light, air and setbacks.
The filler in the joints between tiles. Cement grout is standard; epoxy grout resists stains and water better, which helps in kitchens and bathrooms.
1% for affordable flats (value up to ₹45 lakh and carpet area up to 60 m² in Kolkata and other metros, 90 m² elsewhere) and 5% for others, without input tax credit. A flat sold after its occupancy certificate carries no GST.
H
For fire safety in West Bengal, a building more than 14.5 m tall. High-rises need a fire safety certificate, protected stairs and fire-fighting systems.
Voids and bare stones in hardened concrete, caused by poor compaction or leaking formwork. It weakens the member and lets water reach the steel.
I
You pay for the measured quantity of each item of work at the rate agreed for it in the BOQ, so the total follows what is actually built.
J
An agreement in which a landowner lets a developer build on the land in return for a share of the finished flats or of the sale proceeds.
Measuring the work done on site with both sides present, to the rules of IS 1200. Running bills and the final bill are paid on these measurements.
K
A land unit used in West Bengal: 1 katha is 720 sq ft (about 66.9 m²), made up of 16 chhatak of 45 sq ft each.
The record of rights for land: who holds which dag numbers in a mouza, and in what share. A certified copy is often called a porcha.
L
A thin decorative sheet of paper and resin (IS 2046), commonly 0.8–1 mm thick, pressed onto board. It is hard-wearing and easy to clean.
Permission to change the recorded use of land, for example from agricultural to residential, under section 4C of the West Bengal Land Reforms Act, 1955. Needed before building on land recorded as farmland.
The uses a plan allows on a plot, such as residential, commercial or industrial. Around Kolkata it is set by the land use and development control plans of KMDA and the local authorities.
A professional licensed by KMC to prepare and submit building plans and to supervise the work to them.
A wall that carries the floors and roof above it down to the foundation. Cutting an opening in one, or removing it, needs an engineer’s design.
The most a bank may lend as a share of the property’s value under RBI rules: 90% for loans up to ₹30 lakh, 80% up to ₹75 lakh and 75% above. You pay the rest as the down payment.
A storage platform built high in a room, often over a door or passage. The National Building Code of 2016 treated it as storage, with a height of no more than 1.5 m.
The amount of light falling on a surface, in lumens per square metre. Our lighting calculator follows IS 3646: about 100 lux for bedrooms, 150 for living rooms, 200 for kitchens and 300 for reading.
M
Manufactured sand made by crushing stone. IS 383:2016 allows it in concrete as an alternative to river sand.
The value the registration department sets for a property. Stamp duty is charged on the agreed price or this value, whichever is higher.
Engineered boards of wood fibres pressed with resin. MDF (IS 12406) machines smoothly but swells if it stays wet; high-density moisture-resistant (HDHMR) board copes with damp better.
The width of the road the plot opens onto. Building rules use it to cap the height and the floor area you can build.
Money paid at the start so the contractor can bring labour, tools and materials to site. It is recovered in parts from the running bills.
A kitchen built from factory-made cabinets in standard sizes and fitted on site, with the counter, sink, hob and storage planned together.
A revenue village, the basic unit of land records. A plot is identified by its mouza, the mouza’s JL number and its own dag number.
Recording the new owner after a sale, gift or inheritance: in the land records at the BL&LRO and, separately, in the municipality’s property tax records.
N
A letter from an authority or a person saying they have no objection, for example from the fire service, the airport authority for tall buildings near the flight path, or a co-owner.
Notice to the authority that work is starting under a sanction. Building rules ask for it before work begins on site.
O
The authority’s permission to live in or use a building, given after it checks the building against the sanctioned plan. Utility connections and resale often need it.
The basic cement, sold in 33, 43 and 53 grades by its 28-day strength in N/mm² (IS 269:2015).
P
A wall shared by two neighbouring buildings. Digging or building against it needs care, notice and usually the neighbour’s written consent.
Structural changes, extra rooms or floors, and changes to the facade or use usually need municipal permission; routine repairs and finishes usually do not.
Long concrete columns cast deep in the ground that carry the load down to firmer layers. Common on Kolkata’s soft clay.
Gypsum plaster (IS 2547) used for smooth wall finishes, cornices and some false ceilings. Damp weakens it, so it does not suit bathrooms or walls with seepage.
A beam at ground-floor level that ties the columns together and carries the walls. The damp-proof course usually sits on top of it.
Board made of thin wood layers glued with the grain crossing. MR grade suits dry areas; BWR or BWP grade (IS 303), or marine plywood (IS 710), suits places that get wet, such as under the sink.
A document that lets someone act for the owner. It does not make the holder the owner, so buying on a power of attorney alone does not give you title.
Cement blended with fly ash. It gains strength more slowly, resists cracking and chemical attack better, and needs longer curing (IS 1489 Part 1).
A clause that adjusts the price when the cost of materials such as steel or cement moves beyond an agreed limit, usually by a published price index.
The yearly tax on a property. In Kolkata it is worked out by unit area assessment: the floor area times the base unit value of the property’s block (A to G), adjusted for road width, age and use; the tax is usually 20% of that annual value.
Q
Engineered stone made of crushed quartz bound with resin. It does not absorb water, so it resists stains, but strong heat can mark it.
R
One thick reinforced slab under the whole building, used on weak soil to spread the load and limit uneven settlement.
Working out the price of one unit of an item, such as 1 m³ of concrete, from its materials, labour, equipment, overheads and profit.
Concrete with steel bars cast inside it. The concrete takes the squeezing forces and the steel the pulling forces, so together they make columns, beams and slabs.
Burnt clay brick, the traditional walling unit around Kolkata (IS 1077). A good one gives a clear ring when struck and absorbs no more than 20% of its weight in water.
Recording a deed at the registry office under the Registration Act, 1908, after the stamp duty and registration fee are paid. In Kolkata this is the Registrar of Assurances or an ADSR office.
Housing projects on more than 500 m² of land with more than 8 flats must be registered with the state’s RERA authority before they are advertised or sold (RERA Act, 2016, section 3).
A share of each bill, commonly 5%, held back until the defect liability period ends, so that defects are fixed before it is paid out.
A part payment during the work for the quantities done so far, measured and checked. The final bill settles the rest.
S
The registered document that transfers ownership from seller to buyer. Ownership passes when the deed is registered, not when an agreement is signed.
The approved drawings, stamped by the authority. The building must match them, so keep a copy on site.
India’s earthquake hazard zones in IS 1893 (Part 1):2016. Kolkata is in Zone III, moderate hazard, so buildings need earthquake-resistant design and detailing.
The open space required between the building and each plot boundary. It increases with building height and depends on road width.
The temporary moulds and props that hold wet concrete in shape until it can carry itself. Props removed too early can make a slab sag or crack.
Fine mud mixed in sand. Too much weakens concrete and plaster; a simple jar test on site shows how much there is.
A strip of tile, stone or wood, usually 75–100 mm high, along the foot of a wall. It protects the wall from mops, water and knocks.
The flat RCC plate that forms a floor or roof. A one-way slab spans between two supports; a two-way slab spans in both directions.
Hinges and drawer channels with a built-in damper that closes them slowly and quietly, which reduces wear.
Boreholes and lab tests that show the soil layers, the water table and the safe bearing capacity. The foundation is designed from this report.
Concrete flaking off because the steel inside is rusting and swelling. It needs proper repair of the steel and concrete, not just a coat of plaster.
For a house under construction, the bank releases the loan in stages after checking the work. Until the full loan is drawn you usually pay interest only on the amount released, called pre-EMI.
Tax paid on a sale deed before registration, on the agreed price or the market value, whichever is higher. In West Bengal: 6% up to ₹1 crore and 7% above in municipal areas, 5% and 6% in panchayat areas, plus a 1% registration fee.
A crack caused by load or movement of the structure: often diagonal, wider than a few millimetres or growing. Fine, stable shrinkage cracks are usually cosmetic; structural ones need an engineer.
Built-up area plus a share of the common areas, such as stairs, lobbies and the lift well. The difference from built-up area is called loading.
T
The legal right to own a property, traced through the chain of earlier deeds and records. A clear title has no gaps, disputes or unpaid claims.
Thermo-mechanically treated steel bar with a hard outer layer and a softer core, sold by grade such as Fe500 or Fe500D (IS 1786:2008).
One fixed price for a defined scope of work, from start to handover. Changes to the scope are priced separately as variations.
V
A change to the agreed work, in quantity or design. Agree its price and get it approved in writing before the work is done.
A thin slice of real wood glued onto board (IS 1328) and polished to show its grain. It needs more care than laminate.
A dense tile fired until almost glassy, absorbing 0.5% water or less, so it resists stains and suits floors (IS 15622, group BIa).
W
A white cement-based paste spread thinly to fill small marks and give plaster a smooth base before primer and paint.
The weight of water divided by the weight of cement in a mix. More water makes concrete easier to pour but weaker and more porous.
Best matches
A land unit used in West Bengal: 1 katha is 720 sq ft (about 66.9 m²), made up of 16 chhatak of 45 sq ft each.
20 katha, or 14,400 sq ft, in West Bengal. A bigha is a different size in other states, so check which one a document means.
English definitions checked against the named sources on 8 Oct 2026. Bengali and Hindi names and definitions are drafts awaiting our team’s sign-off.
Still stuck on a word?
Ask in English, Bengali or Hindi. Answers come from our guides, with the source named.

