The seven stages
STEP 01 OF 07STEP 02 OF 07STEP 03 OF 07STEP 04 OF 07STEP 05 OF 07STEP 06 OF 07STEP 07 OF 07Skip the seven steps↓
01
Free consultation
Free
Scope discussion on a call, on WhatsApp or at our Garia office, with no obligation.
We listen first: what you’re building, fixing or planning.
You leave with clarity on next steps, whether or not you proceed.
ON CALL OR ON SITENo obligation
Call usMonday to Saturday, 10am to 7pm
Or we come to your siteYour plot, your questions
What would you like to build?
YOU GETA clear next step, whether or not you go ahead.
02
Free preliminary estimate
Free · usually within 48 hours*
Ballpark scope and an indicative cost range across your chosen services.
Based on your form, photos and drawings; no site visit needed.
This is genuinely free; nothing in this step carries a charge.
PRELIMINARY ESTIMATEFree
Civil work
Interiors
Supply
COST RANGELowHigh
Usually within 48 hours**indicative
YOU GETAn indicative cost range across the services you chose.
03
Site visit, QTO & BOQ
Optional · visit ₹2,499 · BOQ on request
An engineer’s in-depth assessment and site visit: ₹2,499 across Kolkata (₹4,999 for the outskirts, on request).
An engineer-prepared Quantity Takeoff and a formal Bill of Quantities, its fee quoted in writing before any work begins.
Both are adjusted against the contract if you build with us. Many skip straight to step 4.
QUANTITIES AND COSTS · SAMPLEOptional
ITEMQTYUNIT
Excavation42.0m³
Concrete18.5m³
Steel bars2.1t
Brickwork64.0m³
Priced on requestBy our engineers
YOU GETA written site assessment, and an itemised QTO and BOQ on our letterhead.
04
Planning & design
Drawings & approvals
Engineering and architecture finalised; schedule and payment milestones locked.
You sign off on a plan, not a promise.
DRAWINGS & APPROVALSSHEET A-101
LIVINGBEDROOMKITCHENBEDROOM
APPROVED
Timetable fixedPayment plan fixed
YOU GETSigned-off drawings, approvals, a schedule and payment milestones.
05
Execution
One plan
Civil work, supply and interiors run from one plan.
Stage-wise quality inspections before anything gets covered up.
Written change orders for any scope movement.
EXECUTIONOne plan
Civil workSupplyInteriors
→
One planCoordinated, start to handover
YOU GETInspected stages and written change orders.
06
Progress visibility
Dated photos & reports
Milestone photos and reports, so you see progress without chasing anyone.
Honest timelines and an update at every step, so you never guess.
One point of contact for every question across every trade.
PROGRESS · DATEDSAMPLE
12 JAN · FOOTINGS
03 MAR · FIRST SLAB
21 APR · BRICKWORK
Photos and a short report at every milestone
YOU GETDated milestone photos and reports.
07
Handover & support
Defects walkthrough
Documented handover with a defects walkthrough and snag-list closure.
Renovation and retrofitting support any time after the last invoice.
HANDOVEREvery fix done
✓Doors and windows close true
✓Tiles tapped for hollow spots
✓Plumbing pressure-tested
✓Drawings and warranties handed over
WE CHECK IT WITH YOU
YOU GETHandover documents and a closed snag list.
BEFORE YOU SIGN · TWO FREE, ONE OPTIONALONCE YOU SIGN · ONE PLAN TO HANDOVER
CONTRACT TYPES
Three ways to contract with us.
Each one splits price certainty, flexibility and paperwork differently. Answer two questions and we will point to the one that usually fits.
Your design is
You want to
Item-rate
Usually fits
You pay an agreed rate for each item of work, such as per cubic metre of concrete or per square metre of plaster, times the quantity actually done and measured.
Price certaintyMedium
FlexibilityHigh
Paperwork for youMedium
BEST FOR Designs that may still change, and owners who want to see every line of the bill.
Turnkey (lump sum)
Usually fits
One agreed price for a defined scope and specification. We deliver the finished building against the signed drawings, and any change is priced in writing first.
Price certaintyVery high
FlexibilityLow to medium
Paperwork for youLow
BEST FOR A settled design, and owners who want one number and one firm to answer to.
Cost-plus
Usually fits
You pay the actual cost of materials and labour, backed by bills, plus an agreed fee for managing the work. The books stay open to you throughout.
Price certaintyLow to medium
FlexibilityVery high
Paperwork for youHigh
BEST FOR Renovations and retrofits, where the full extent of the work only shows once walls and floors are opened.
Whichever type you choose, scope changes are agreed in writing before the work changes, and payments follow the stages in your contract.
Questions we get asked first
Yes — the preliminary estimate is genuinely free: a ballpark scope and indicative cost range based on your form, with no obligation. If you want an engineer on site, an in-depth assessment and site visit is ₹2,499 across Kolkata (₹4,999 for the outskirts, on request), adjusted against the contract if you go ahead with us. And if you want engineer-verified, itemised figures, a Detailed QTO & BOQ is available — pricing is project-specific and shared with you on request — and that amount is fully credited against your project bill if you build with us. Three steps, each priced plainly, no surprises.
A Quantity Takeoff (QTO) is the engineering count — exactly how much steel, cement, brick, labour your drawings need. A Bill of Quantities (BOQ) turns that into a formal, line-by-line priced document. It's what banks accept for loans and what lets you compare contractors item by item instead of lump sum vs. lump sum.
Pricing is project-specific — it depends on size, complexity and drawing quality (CAD sets take less work than scanned PDFs). Tell us about your project and we'll quote the fee up front, in writing, before any work begins. Tender-grade packages — bar bending schedules, rate analysis, material reconciliation and tender documents — are scoped individually the same way.
It's a credit against future work with Delta Structures, not a cash-refund voucher — you keep the full professional BOQ document either way, which has standalone value for loans and comparisons. The exact edge-case policy is stated in our Terms so there's one consistent answer everywhere.
Against completed, verifiable milestones — never large lump sums up front. A typical shape: a modest advance, then stage payments at plinth, each slab, brickwork, and finishes, with a retention amount held until handover. Every change of scope is priced in writing before work proceeds.
It goes through a written change order: what's changing, what it costs, what it does to the timeline — signed off before execution. No verbal 'we'll adjust it later.'
Defects in our execution are ours to make good, on the terms and for the period set out in your signed agreement. Manufacturer warranties on materials and fittings pass to you at handover.
Usually within 48 hours* for the free preliminary estimate — indicative, not guaranteed: timing can vary with the complexity of the query and the work involved, and we strive to respond as soon as we can. The Detailed QTO & BOQ, when opted for, takes a few business days because an engineer actually measures and prices your drawings — the timeline is confirmed on your receipt.
Start with steps one and two.
A free consultation and a free preliminary estimate, usually within 48 hours.* No obligation. A site visit, if you want one, is ₹2,499, adjusted against the contract.