Differential settlement, not settlement itself, is what cracks buildings – the problem is uneven movement.
Thin (under 1mm), random or map-patterned, and only skin-deep in the plaster = shrinkage, usually cosmetic. Wide (3mm+), directional (diagonal from window corners, long horizontals, stepped through brick joints), passing through the wall, or growing over time = possibly structural — get it assessed.
No guides match “”.Try a broader word such as damp, cement or RERA, or ask Delta below.
DID YOU KNOW · 1 OF 210
Rust expands 4-6 times the steel it grows from - that expansion is what pops the concrete off old Kolkata buildings.
These guides describe standard Indian construction practice and field checks aligned with IS codes, such as IS 456 for concrete, IS 383 for aggregates and IS 1893 for seismic zoning. They are general education. Every building is different, so treat anything structural as a reason for an on-site professional assessment, not a do-it-yourself diagnosis.
ASK DELTA · ENGLISH · বাংলা · हिंदी
Still have a question?
Ask in English, Bengali or Hindi. Answers come from these guides, with the source named.
Ready to plan your own build?
Five taps give you a cost range, a season plan and your area’s rules. Or send us your plot for a free preliminary estimate, usually within 48 hours.*
New Town and Sector V each have their own authority. In New Town, NKDA sanctions plans under the New Town Kolkata Development Authority Act, 2007 and its Building Rules, 2009, online only through its OBPAS portal, with an architect and engineers enrolled with NKDA; a sanction lasts 5 years and can be renewed for 5 more. Sector V is run by the Nabadiganta Industrial Township Authority (NDITA), which sanctions building plans and issues completion certificates there. The rest of Salt Lake is Bidhannagar Municipal Corporation.
IN PLAIN WORDS
Think of New Town and Sector V as gated campuses inside the city: the campus office, not the city office, signs your building papers.
New Town and Salt Lake Sector V are planned places, each with its own authority. New Town was laid out by the state from the late 1990s on former farmland and wetland east of Salt Lake, in Action Areas with plotted housing, apartment blocks and business districts; NKDA, the New Town Kolkata Development Authority, runs its civic services and sanctions its buildings. Sector V grew as Salt Lake's industrial and IT district and is run by the Nabadiganta Industrial Township Authority (NDITA).
This guide first explains what is different about building in a planned township, how NKDA's online process works in practice, the airport and fire thresholds that matter here, how Sector V differs, and what happens once a building is finished. The sections after that set out NKDA's papers, the construction rules and the occupancy certificate, and which body governs which plot. Sanction Navigator in our Lab lists the steps.
Building in a planned township
In New Town the plot comes with more rules than the building code alone. Most plots were allotted by HIDCO, the state agency that planned and built the township, and the allotment and the deed or lease carry their own conditions: what the plot may be used for, sometimes a time within which to build, and how it may be transferred. Read those papers alongside NKDA's building rules, because both bind the owner.
The township's roads, drains, water supply and plot sizes were planned together, so the building rules here follow the plan: NKDA's own Building Rules, 2009, made under the New Town Kolkata Development Authority Act, 2007. They differ from the KMC rules and from the 2007 municipal rules in places, so a plan drawn for Kolkata or a municipality cannot simply be reused.
NKDA's online process in practice
NKDA takes building plans only online, through its OBPAS portal. The architect and engineers who prepare the plan must be registered and enrolled with NKDA, and they file the plan, the structural design and the soil test, upload the papers and answer any queries online. The fee and the sanction come through the same portal, and later the occupancy certificate application goes the same way.
Because the file is checked against the rules on the portal, a complete and correct application moves cleanly; a missing paper or a plan that breaks the rules comes back at once. The papers NKDA asks for at the start (the deed, the memorandum of possession, the mutation certificate and paid-up tax) are worth gathering before the architect begins.
Height, fire and the airport
New Town lies close to the airport, so the height a building may reach is often set by the Airports Authority of India's Colour Coded Zoning Map rather than by the plot alone, and NKDA asks for an AAI NOC as per that map. NKDA also asks for a fire safety recommendation for every non-residential building and for any building above 15.1 m or on a plot over 1,500 sq m, a slightly different threshold from the 14.5 m used elsewhere in the state. Checking both before design saves redrawing.
Towers going up in New Town, where the airport often sets how high a building may rise.Photo: Rameshng, CC BY-SA 3.0, via Wikimedia Commons
Plots, boundary walls and the street
New Town's streets were planned to look a certain way, and NKDA controls the boundary wall as well as the building: it needs sanction, with limits on the height of the solid part, and lower limits along the splay of a corner plot so that drivers can see. Building material may sit on the footpath only for the first months of construction, leaving room for people to walk, and debris goes to a designated place. These rules are easy to break by accident on a busy site, and a complaint can hold up the occupancy certificate.
Sector V is different
Sector V is not under NKDA or Bidhannagar Municipal Corporation. It was made an industrial township in 2006, and the Nabadiganta Industrial Township Authority sanctions building plans and issues completion certificates there. Its plots are mainly for offices, IT and industry, and the 2007 municipal building rules have a part of their own for it. Anyone building or refitting in Sector V should start with NDITA, not the corporation next door.
An office block going up in GP Block, Salt Lake Sector V, in 2013: plans here go to NDITA.Photo: Biswarup Ganguly, CC BY 3.0, via Wikimedia Commons
After the building is finished
The occupancy or partial occupancy certificate is applied for online by the architect and engineer who signed the commencement notice.
A permanent water connection from NKDA is applied for with that certificate.
Property tax is assessed by NKDA; keep the assessment and the receipts.
Later additions or alterations, including a boundary wall change, need NKDA's sanction.
In Sector V, the completion certificate comes from NDITA.
For buyers in New Town
Check that the plot's allotment, deed or lease allows the use and the transfer.
Ask for NKDA's sanction and the occupancy certificate for the building, not only the plan.
Check the project's WBRERAregistration where it applies.
For a plotted house, ask whether the boundary wall and any later additions were sanctioned.
New Town: NKDA
NKDA’s Building Department sanctions, renews and re-sanctions building plans, issues occupancy and partial occupancy certificates, gives water connections and acts against unauthorised construction.
You engage a registered architect and an engineer enrolled with NKDA. They prepare the plan, the structural design and the soil test to the NKDA Building Rules, 2009.
There is no paper filing: the plan, and later the occupancy certificate application, go online through NKDA’s OBPAS portal.
The registered deed of conveyance, the memorandum of possession, the mutation certificate (Form G) and up-to-date property tax.
A fire safety recommendation from West Bengal Fire & Emergency Services for every non-residential building, and for any building over 15.1 m high or on a plot over 1,500 sq m.
An Airports Authority of India NOC as per the Colour Coded Zoning Map.
A Pollution Control Board NOC for a built-up area over 1,50,000 sq m, and plantation plan approval from the Forest Department over 20,000 sq m.
A boundary wall needs sanction too: 1.5 m of masonry from ground level, or 900 mm with wire mesh, and on a corner plot the solid part along the splay no higher than 750 mm.
While you build, and the occupancy certificate
Give a commencement notice (rule 12(1), Schedule IV) before work starts.
Building material may sit on the footpath only for 6 months from the start, leaving 1.5 m for people to walk; after that it stays inside your plot. Debris goes to a designated place at your cost, or NKDA removes it, for a charge, if told in advance.
The sanction is valid for 5 years and can be renewed for 5 more; a partly built building with a partial occupancy certificate can be revalidated for another 5. NKDA adds a yearly fee if the plan is filed more than three years after you took possession of the plot.
The occupancy or partial occupancy certificate is applied for online by the architect and engineer who signed the commencement notice, with the completion plan, structural stability certificates for the building and the underground reservoir, the plumbing and electrical completion certificates, the lift certificate, the area and parking statement and the tax clearance, plus the fire and AAI papers where they apply.
A permanent water connection is applied for with the occupancy or partial occupancy certificate.
Salt Lake Sector V: NDITA
Sector V was planned as Salt Lake’s industrial area. The state made it an industrial township under section 385A of the West Bengal Municipal Act, 1993, by a notification of 31 January 2006, and the Nabadiganta Industrial Township Authority took over its civic work. NDITA sanctions building plans and issues completion certificates in Sector V, and the West Bengal Municipal (Building) Rules, 2007 have a part of their own (Part X) for the Nabadiganta Industrial Township. Its office is Nabadiganta Bhavan, GN 20, Sector V, Kolkata 700091.
NKDA, the New Town Kolkata Development Authority, under its Act of 2007 and Building Rules of 2009, online through its OBPAS portal.
Can a New Town plan be filed on paper?
No. NKDA takes building plans only online, filed by an architect and engineers enrolled with NKDA.
Does a house in New Town need a fire recommendation?
NKDA asks for one for non-residential buildings and for buildings above 15.1 m or on plots over 1,500 sq m. A typical plotted house is below these.
Who governs Salt Lake Sector V?
The Nabadiganta Industrial Township Authority (NDITA), which sanctions building plans and issues completion certificates there.
Does a boundary wall in New Town need sanction?
Yes. NKDA sanctions boundary walls, with limits on their height and on corner plots.
Can you build in New Town or Sector V?
Yes. We plan to the authority that governs the plot and work with architects and engineers enrolled with it, so the online file goes in complete.
RED FLAGS ON SITE
A New Town plan said to be filed “offline”, or by someone not enrolled with NKDA
Building material on the footpath long after the first six months
A Sector V building in use without NDITA’s completion certificate
Possession of a flat before the occupancy certificate
PRO TIP
We plan New Town and Sector V buildings to the authority that governs the plot, and we work with architects and engineers enrolled where the authority asks for it, so the online file goes in complete the first time.
Checked against these sources on the dates shown, pending our team’s sign-off. Rules change, so we check them again for your plot before anything is filed.