Skip to content
Delta Structures
EstimateFree estimate
KNOWLEDGE HUB · 112 FREE FIELD GUIDES

Know before you build.

Plain-language guides from our engineering desk. No jargon without a translation and no scare tactics, just the checks and rules of thumb professionals use on site, so you can talk to any contractor, including us, as an informed client.

You have read 0 of 112 guides
DID YOU KNOW15 OF 36

Differential settlement, not settlement itself, is what cracks buildings – the problem is uneven movement.

FROM THE GUIDE Structural crack vs shrinkage crack

Showing 12 of 112 guidesAll 112 guides

No guides match “”.Try a broader word such as damp, cement or RERA, or ask Delta below.
DID YOU KNOW · 1 OF 210

Rust expands 4-6 times the steel it grows from - that expansion is what pops the concrete off old Kolkata buildings.

These guides describe standard Indian construction practice and field checks aligned with IS codes, such as IS 456 for concrete, IS 383 for aggregates and IS 1893 for seismic zoning. They are general education. Every building is different, so treat anything structural as a reason for an on-site professional assessment, not a do-it-yourself diagnosis.

ASK DELTA · ENGLISH · বাংলা · हिंदी

Still have a question?

Ask in English, Bengali or Hindi. Answers come from these guides, with the source named.

Ready to plan your own build?

Five taps give you a cost range, a season plan and your area’s rules. Or send us your plot for a free preliminary estimate, usually within 48 hours.*

*Indicative, not guaranteed. Timing varies with the complexity of your query.

Search or ask Delta
PROJECT MGMT· 9 MIN READ
এই গাইডটি এখনও শুধু ইংরেজিতে।

Payment milestones that protect you

Scaffolding going up for plastering on a building under construction in India
Photo: రవిచంద్ర, CC BY-SA 4.0, via Wikimedia Commons
THE SHORT ANSWER

Pay against completed, verifiable stages — never large amounts up front. A healthy shape: a modest advance (~10%), then stage payments at plinth, each slab, brickwork, plaster and finishes, with 5–10% retention held until after handover. Every payment should follow an inspection, and every scope change should be a written, priced change order.

IN PLAIN WORDS

Milestone payments are cash-on-delivery, stage by stage. Full advance payment converts you from customer into unsecured lender — to someone you met last month.

How you pay for a building matters as much as how much you pay. A payment plan tied to finished, visible stages keeps the money and the work moving together, so that at any point you have paid roughly for what has been built. A plan that front-loads payments, or ties them to vague percentages of progress, turns you from a customer into an unsecured lender, and leaves you with little leverage if the work slows or stops.

This guide explains why stage payments work, what a fair advance is, how to define each stage so that everyone agrees when it is done, a sample schedule for a house, how materials, extra work and retention fit in, how payments link to bank loan disbursements, what records to keep, and the warning signs in a payment plan. The percentages here are examples to show the shape, not rates or prices; your own plan depends on the contract type and the work.

Why stage payments work

In a stage payment plan, each payment is released when a defined stage of the work is complete and has been checked. The contractor is paid for what has been built, and you can see what you have paid for. If the work slows, the money slows too; if a dispute arises, the amount at stake is limited to one stage. It also helps an honest contractor: a clear plan, paid on time, keeps their cash flow steady and their labour on site.

The alternative, paying large sums in advance or on vague claims of progress, puts all the risk on you. A contractor who has been paid ahead of the work has less reason to finish it, and if they leave, the money already paid for unbuilt work is hard to recover.

The advance

Most contractors ask for an advance to mobilise: set up the site, bring labour and buy the first materials. A modest advance is reasonable. It should be small enough that walking away would cost the contractor more than it costs you, and it is often recovered from the first few stage payments rather than paid on top of them. A demand for a large share of the contract value up front, before anything is built, is a warning sign.

If a larger advance is unavoidable, for example for materials bought in bulk, tie it to something you can verify: materials delivered to your site against challans, or a bank guarantee from the contractor for the amount. For flats bought from a promoter, RERA limits the advance to 10 percent of the cost before a registered agreement for sale; our RERA guide explains it.

Define each stage so it can be checked

A stage must be something you can see, photograph and agree on. "Ground floor slab cast and props in place" can be checked; "40 percent of the work done" cannot. Write down, for each stage, exactly what must be finished, what inspection or test goes with it, and what papers the contractor hands over before payment. A one-page schedule with three columns, stage, amount and what complete means, signed by both sides, prevents most payment disputes.

  • Describe the work, not a percentage: "first floor slab cast", "brickwork up to lintel on all floors".
  • Name the check: the engineer's inspection, the cube results, the plumbing pressure test, the flood test.
  • List the papers due with each stage: measurements, test reports, photographs.
  • State the amount, or the share of the contract, for each stage.
  • State how long you have to inspect and pay after the contractor says a stage is done.

A sample schedule for a house

The table below shows the shape of a stage payment plan for a house on a lump-sum or item-rate contract. The stages follow the order of the work, and the shares are illustrative only, to show how payments track the work; the right shares depend on your contract, the cost of each stage and the number of floors. A multi-storey building has a stage for each slab.

AdvanceEXAMPLE SHAREAbout 5–10%WHAT 'COMPLETE' MEANSAgreement signed, site set up, recovered from later stages
Foundation and plinthEXAMPLE SHAREAbout 10–15%WHAT 'COMPLETE' MEANSFootings and plinth beams cast, plinth filled, plinth level checked
Each slabEXAMPLE SHAREAbout 10–15% eachWHAT 'COMPLETE' MEANSColumns and slab cast, cube results acceptable, props in place as specified
BrickworkEXAMPLE SHAREAbout 10%WHAT 'COMPLETE' MEANSWalls up to the slab on all floors, lintels cast
Plaster and services rough-inEXAMPLE SHAREAbout 10%WHAT 'COMPLETE' MEANSInside and outside plaster done, wiring conduits and pipes laid and tested
Flooring and finishesEXAMPLE SHAREAbout 10–15%WHAT 'COMPLETE' MEANSFloors, wall tiles, doors and windows fixed
HandoverEXAMPLE SHAREAbout 5%WHAT 'COMPLETE' MEANSSnag list agreed and fixed, keys, drawings and warranties handed over
Retention releaseEXAMPLE SHAREAbout 5%WHAT 'COMPLETE' MEANSEnd of the defects liability period, defects fixed
Building frames going up beside the Eastern Metropolitan Bypass, Kolkata
Photo: Biswarup Ganguly, CC BY 3.0, via Wikimedia Commons

Materials and extra work

On some contracts you buy major materials yourself, such as cement, steel or tiles, and the contractor is paid only for labour. That gives you control of the materials but also the work of buying, checking and storing them; our guides to cement, steel, sand and bricks explain the checks. If the contractor supplies materials, payment for them should follow delivery to your site and your check of the challans, not a promise.

Changes always come up during a build: a room enlarged, a better tile, an extra wall. Each one should be a written change order before the work is done, describing the change, its price and its effect on the time, signed by both sides. Unwritten extras are the most common cause of disputes at the end of a project, when the contractor's final bill contains items you never agreed to price.

Retention and the defects period

Retention is a small share of each payment, or of the contract, held back until the end of an agreed defects liability period after handover. It gives the contractor a reason to come back and fix defects that appear in the first months: leaks in the first monsoon, cracks in plaster, doors that stick. At the end of the period, once the defects are fixed, the retention is released. Our guide to retention and the defects liability period explains how to set it up.

Linking payments to your home loan

If you are building with a bank loan, the bank releases the loan in stages too, usually after its own engineer or valuer has inspected the work. Align the contractor's stages with the bank's disbursement stages where you can, so that money arrives when each payment falls due. Ask the bank early what stages and papers it needs, and allow time for its inspections. Our guide to loan stages explains how construction loans are released.

Records to keep

A payment plan is only as good as the records behind it. Keep a simple file from the start, and you will be able to answer any question about what was paid for and when.

  • The signed contract and payment schedule.
  • Each stage's inspection note, with dated photographs from the same angles.
  • Measurements of the work for item-rate contracts, signed by both sides.
  • Test reports: concrete cubes, steel certificates, plumbing and waterproofing tests.
  • Invoices and receipts for every payment, paid by bank transfer, not cash.
  • Every change order, signed and priced.
  • Delivery challans for materials you paid for.

Warning signs

Most payment problems give early warnings. Treat any of these as a reason to pause and ask questions before paying more.

  • A large advance demanded before any work.
  • Pressure to pay ahead of the schedule, to "hold the labour" or "lock the rates".
  • Stages defined as percentages of work rather than finished parts of the building.
  • Requests for cash, or payments to someone other than the contracting party.
  • Extra work done and billed without a written change order.
  • Payments running ahead of what you can see on site.

Structure that keeps everyone honest

  • Advance small enough that walking away hurts the contractor more than you.
  • Each release tied to a stage you can see and photograph — 'slab cast and cured', not '40% work done'.
  • Retention: the last 5–10% paid only after defects noticed at handover are fixed.
  • Material advances (if any) against delivery challans to YOUR site, not promises.

The paperwork that matters

A one-page payment schedule signed by both sides beats a thick contract nobody reads. Stages, amounts, what 'complete' means for each — three columns, no ambiguity.

Questions people ask

How much advance is reasonable?

A modest share, often around 5 to 10 percent, recovered from later stages, is common for house construction. A demand for a large share up front is a warning sign.

Should we pay for materials in advance?

Only against delivery to your site and your check of the challans, or against a bank guarantee. Avoid paying for materials that have not arrived.

What is retention?

A small share held back until the end of the defects liability period after handover, so the contractor has a reason to fix early defects. It is released once they are fixed.

How do we handle changes during the build?

With a written change order for each one, describing the change, its price and its effect on time, signed before the work is done.

Can stage payments match our bank loan?

Yes, and they should. Ask the bank which stages it releases the loan at, and align the contractor's schedule with them.

How do you structure payments?

Our contracts are stage-based with retention, with each stage defined in writing and checked before payment. Our Construction Timeline Phaser shows how the stages follow one another over time.

RED FLAGS ON SITE
  • 30–50% demanded as mobilization advance
  • Pressure to pay ahead of schedule 'to hold labour'
  • No written trail for scope changes already executed
PRO TIP

Our own agreements are milestone-based with retention — because a payment structure that protects the client also protects the honest builder.

WORK IT OUT · FREE CALCULATORConstruction Timeline PhaserArea + floors → indicative weeks per phaseOpen the calculator → PLAY · ONE MINUTEWhere does the money go?Share out a house’s budgetPlay the game →
QUIZ · THREE QUESTIONS

Did it stick?

QUESTION 1 OF 3 About how much advance is healthy at the start?
Ask our engineers on WhatsApp
Sources · checked 15 Nov 2026
  1. The Real Estate (Regulation and Development) Act, 2016, section 13 (advances for flats)Checked 15 Nov 2026
  2. CPWD Works Manual (stage payments, secured advances and retention on public works)Checked 15 Nov 2026

Checked against these sources on the dates shown, pending our team’s sign-off. Rules change, so we check them again for your plot before anything is filed.