Skip to content
Delta Structures
EstimateFree estimate
KNOWLEDGE HUB · 112 FREE FIELD GUIDES

Know before you build.

Plain-language guides from our engineering desk. No jargon without a translation and no scare tactics, just the checks and rules of thumb professionals use on site, so you can talk to any contractor, including us, as an informed client.

You have read 0 of 112 guides
DID YOU KNOW15 OF 36

Differential settlement, not settlement itself, is what cracks buildings – the problem is uneven movement.

FROM THE GUIDE Structural crack vs shrinkage crack

Showing 12 of 112 guidesAll 112 guides

No guides match “”.Try a broader word such as damp, cement or RERA, or ask Delta below.
DID YOU KNOW · 1 OF 210

Rust expands 4-6 times the steel it grows from - that expansion is what pops the concrete off old Kolkata buildings.

These guides describe standard Indian construction practice and field checks aligned with IS codes, such as IS 456 for concrete, IS 383 for aggregates and IS 1893 for seismic zoning. They are general education. Every building is different, so treat anything structural as a reason for an on-site professional assessment, not a do-it-yourself diagnosis.

ASK DELTA · ENGLISH · বাংলা · हिंदी

Still have a question?

Ask in English, Bengali or Hindi. Answers come from these guides, with the source named.

Ready to plan your own build?

Five taps give you a cost range, a season plan and your area’s rules. Or send us your plot for a free preliminary estimate, usually within 48 hours.*

*Indicative, not guaranteed. Timing varies with the complexity of your query.

Search or ask Delta
CIVIL WORKS· 14 MIN READ
এই গাইডটি এখনও শুধু ইংরেজিতে।

Tile work red flags — the hollow-tap test & more

Mortar going down before floor tiles are set: the bed decides whether a tile rings hollow
Photo: U.S. Navy, Public domain, via Wikimedia Commons
THE SHORT ANSWER

Tap every tile with a coin or key: a hollow sound means voids under it — that tile will crack or pop loose. Also check edges sit flush (no 'lippage'), joints are even, and bathroom floors slope TO the drain, not away from it.

IN PLAIN WORDS

A hollow tile is a tooth with a cavity — looks fine on the surface, fails under the first real bite.

Tiles are the finish you touch every day and the one most likely to reveal a hurried job. A floor can look perfect on the day it is cleaned for handover and still hide hollow patches that crack under the first heavy cupboard, edges that chip where they stand proud of their neighbours, and bathroom floors that send water away from the drain. Almost all of these faults can be found in an hour with a coin, a straight edge and a mug of water.

This guide explains how a tiled floor or wall is built, why tiles go hollow, crack or lift, the checks to make during the work and at handover, what is particular to bathrooms, balconies and large tiles, how Kolkata's climate and older buildings affect tiling, and what can be fixed without breaking up the whole floor. It is a checklist for owners and site supervisors, not a method statement for the tiler.

How a tiled surface is built

A tile is only the top of a layered system. Under it is a bed of mortar or a layer of tile adhesive, and under that a base: a concrete slab, a screed laid to level or slope, a waterproofing layer in wet areas, or a plastered wall. The tile stays put only as long as every layer is sound and bonded to the next, and the system can cope with the small movements of the building and the tiles themselves.

Two ways of fixing are common on Indian sites. In the traditional method, tiles are bedded on a thick layer of cement and sand mortar, with a neat cement slurry spread over the bed or on the tile's back to make it grip. In the thin-bed method, tiles are fixed with a factory-made adhesive spread with a notched trowel on a flat, level base. Vitrified and porcelain tiles absorb very little water, so plain cement mortar grips them poorly; the Indian standard for tile adhesives, IS 15477, sets out the types of adhesive made for them and for other demanding uses.

  • The base: sound, clean, and flat or sloped as the room needs.
  • Waterproofing in wet areas, laid and tested before tiling.
  • The bed: mortar or adhesive, covering the back of the tile fully.
  • The tile: chosen for the room's use, wear and water.
  • Joints: even, filled with grout, with movement joints where the floor needs them.
Floor tiles being laid in a new room, in Greece
Photo: Tony Esopi, CC BY-SA 3.0, via Wikimedia Commons

Why tiles go hollow

A hollow tile is a tile that is not fully bonded to its bed. Tap it with a coin or a key and it sounds dull and drummy instead of solid. The void under it may be small at a corner or cover most of the tile. Hollow tiles are the most common tiling defect we find at handover, and the most important, because a tile that is not supported cracks under point loads, rocks, and eventually lifts.

The causes are almost always in the fixing. The mortar bed was too dry, or had started to set before the tile was laid. The tile was pressed onto a few dabs of mortar instead of a full bed. The adhesive was spread too thin, or with the wrong trowel for the tile size, or the tile was not pressed and slid into place to collapse the ridges. Large tiles were not back-buttered. Dust on the base or on the back of the tile stopped the bond. Or the floor was walked on and loaded before the bed had cured.

Cracks, lifting and tenting

Tiles crack for a handful of reasons. A hollow tile cracks under a load it cannot spread. A tile laid across a crack or a joint in the slab below cracks along the same line when the slab moves. A floor tiled tight from wall to wall, with no gaps at its edges, has nowhere to go when it warms and expands, so tiles crack or push up. And a crack that runs through tiles and grout in a long straight or diagonal line, especially one that keeps growing, may come from the structure below and needs an engineer's look rather than new tiles.

Tenting is when a group of tiles lifts in a ridge, sometimes suddenly and with a loud crack. It is usually a sign that the floor had no room to expand: no gap at the walls, no movement joints across a large area, joints filled with rigid grout, and a hot day or direct sun on the floor. Kolkata's heat, and floors near large windows or on open terraces, make it more likely.

Lippage, joints and the look of the floor

Lippage is when the edge of one tile stands higher than its neighbour. Run your palm across the joints, or slide a straight edge along the floor: you should feel smooth transitions, not steps. Even a small lip catches light, collects dirt, chips under chair legs and catches toes. Some lippage is unavoidable with tiles that are slightly bowed, which is normal for large tiles within the maker's limits, but the tiler should choose the pattern and use levelling clips so that it stays small.

Joints should be the same width throughout the room, straight, and lined up with the room's main lines or the centre of the room as agreed. Spacers or levelling clips keep them even. Grout should fill each joint fully, flush or very slightly below the tile edge, without pinholes, cracks or smears left on the tile faces. Cut tiles should be placed at the less visible edges of the room, not in the doorway, and no cut piece should be a thin sliver.

Checks while the work is going on

Most tiling faults are cheap to fix on the day they happen and expensive a month later. If you or your supervisor can be on site during the first day of tiling in each room, a few checks save a great deal of trouble.

  1. 1Before tiling: the base is clean, sound and dry enough, cracks in the slab are marked, wet-area waterproofing is done and flood-tested, and the floor level and slope are marked on the walls.
  2. 2Tiles: check the boxes for the same shade and batch code, and lay out a few tiles dry to check for bow, size and colour differences before fixing starts.
  3. 3Bed: watch the first few tiles go down. The mortar should be freshly mixed and the adhesive spread with the right notched trowel; lift one tile soon after fixing and look at the back. It should be almost fully covered.
  4. 4Layout: the first row is set out from a line, joints are kept with spacers or clips, and cut pieces go to the edges.
  5. 5Edges: a gap is left at walls and columns, hidden under the skirting, and movement joints are planned across large floors and at doorways.
  6. 6Curing and traffic: nobody walks on the floor or loads it until the bed has set, and grouting waits as long as the adhesive or mortar asks.

The handover inspection

At handover, check every tiled floor and wall before the furniture goes in. It takes about an hour for a flat, and it is the last moment when a contractor can lift and relay tiles without moving your belongings. Do it in daylight with the floor dry and clean.

  1. 1Tap test: tap every floor tile with a coin, key or small rubber mallet, especially corners and edges. Mark hollow tiles with masking tape and count them room by room.
  2. 2Straight edge: slide a long straight edge or spirit level across the floor in a few directions to check flatness and feel for lippage at the joints.
  3. 3Joints: look along each joint line for even width and straightness; check grout for gaps, cracks and pinholes.
  4. 4Faces: look at the tiles at a low angle against the light for chips, cracks, scratches and mismatched shades.
  5. 5Slope: in bathrooms, balconies and kitchens with a floor trap, pour a mug of water at the far corner and watch it run to the drain without stopping or pooling.
  6. 6Edges: check that skirting hides a gap at the walls, that tiles meet thresholds and other floors neatly, and that wall tiles are plumb with even joints and no hollow sound.

Bathrooms, balconies and kitchens

Wet areas need two extra things from tiling. The first is the right fall: the floor must slope evenly to the trap, usually only a little, so that water runs off without the floor feeling steep. A floor laid flat, or with a hump between the shower and the trap, leaves puddles that soak into grout and eventually into the slab. The second is a tested waterproofing layer under the tiles, turned up the walls, and finished before any tile is laid. Our guide to waterproofing options explains the systems and the flood test.

Grout in showers and around traps needs extra care: joints should be fully filled, and the joint where the wall meets the floor and around the trap and pipes is best finished with a flexible sealant made for wet areas rather than rigid grout. Epoxy grout resists water and stains better than cement grout and is worth the extra cost in showers and kitchen counters. Floor tiles in wet areas should be rated for slip resistance; a glossy tile that looks good in a showroom can be dangerous underfoot when it is wet.

A bathroom being tiled, in Greece
Photo: Tony Esopi, CC BY-SA 3.0, via Wikimedia Commons

Large tiles and slabs

Large-format tiles and slabs, common now in living rooms, show every weakness in the base and in the fixing. They need a flatter base than small tiles, full adhesive cover with the back buttered as well as the bed, levelling clips to control lippage, and two people to handle and place them so that they do not crack before they are laid. Many makers also recommend narrower joints and specific adhesives. A floor laid with large tiles on a thick, uneven mortar bed in the old way is the most common source of hollow patches we find.

Larger tiles also make movement more important. A big floor in one finish, especially one that gets sun through glass doors, needs movement joints at the edges and across the floor at intervals the tile and adhesive makers recommend, filled with a flexible sealant, not grout.

What is different about Kolkata

Kolkata's heat and humidity are hard on tiled floors. Floors near large windows and on terraces swing widely in temperature through the day, so edge gaps and movement joints matter more here than in milder places. The monsoon brings months of wet feet, damp air and mud, so slip resistance and the slope in balconies and entrances matter too.

Many renovations here lay new tiles over old floors, sometimes over old mosaic or red oxide floors that have lasted for decades. That can work if the old floor is sound, bonded and level, and if the extra height works at doors and thresholds. It fails when the old floor is hollow, cracked or damp, because the new tiles inherit every one of its problems. Tap the old floor first. On ground floors of older houses, damp rising through the slab can push tiles off and stain grout; a damp problem needs its own diagnosis before any retiling.

What can be fixed, and how

A few hollow tiles in a room are common and easy to repair: each is cut out carefully at its grout lines, the old bed is cleaned off, and a new tile from the same batch is fixed with a full bed or adhesive cover. That is why it is worth keeping a box or two of spare tiles from the original batch; tiles from a later batch rarely match exactly.

Wider problems are a different matter. A room where many tiles are hollow, a floor with no slope to the drain, wall tiles coming away in sheets, or a floor that has tented usually means the fixing was wrong across the room, and patching single tiles only moves the problem. In those cases, the honest answer is to lift the tiles, find and fix the cause in the base or the bed, and relay them. Injecting resin under hollow tiles is offered by some contractors; it can help in a few places where lifting a tile is not practical, but it is not a substitute for a properly fixed floor.

  • Keep two or three boxes of spare tiles from the same batch.
  • Mark and count hollow tiles room by room at handover, and agree the repair in writing.
  • Insist on lifting and relaying where the fault is across a room.
  • Fix slope problems in wet areas by relaying, not by adding sealant.
  • Have a long straight or diagonal crack through tiles checked by an engineer before replacing them.

Your handover inspection, tile edition

  • Tap test across the floor, especially corners and edges of each tile — hollow zones mean incomplete mortar/adhesive coverage.
  • Lippage: run your palm across joints; edges standing proud of neighbours will chip and trip.
  • Joint discipline: even spacing (spacers used), grout filled fully, no chipped edges pointing up.
  • Slope check in wet areas: pour a mug of water — it must travel to the drain without pooling.
  • Expansion gaps at walls and across large floors — tiles laid dead-tight buckle in heat.

Questions people ask

How many hollow tiles are acceptable?

There is no single number in an Indian standard that every contract uses, so agree it in writing before the work starts. In practice, the odd hollow corner in a room is common; a hollow centre, a run of hollow tiles, or hollow tiles in wet areas, doorways and under heavy furniture should be lifted and relaid.

Is a hollow tile going to crack?

Not always at once, but it is more likely to. A tile with a void under it cannot spread a load such as a cupboard leg, a dropped pot or a chair rocking on it. Hollow tiles in busy areas often crack within months.

Should we use tile adhesive or cement mortar?

For vitrified, porcelain and large tiles, a suitable adhesive under IS 15477 is the better choice, because these tiles absorb very little water and plain cement does not grip them well. Thick mortar beds are still used to make up levels and slopes, with the tiles then fixed with adhesive or a well-applied slurry.

Why is there a gap under the skirting?

Because the floor needs room to expand. Tiles laid tight against the walls can crack or lift on hot days. The skirting hides a small gap left at the edge of the floor.

Can we tile over our old floor?

Often, if the old floor is sound, bonded, level and dry, and the extra height suits the doors and thresholds. Tap it first: hollow, cracked or damp old floors should be taken up, not covered.

Can you check our tiling before we take possession?

Yes. We do handover inspections with the tap test, slope checks and a written list of what to fix. Our Material List tool in the Lab also counts tiles room by room if you are still planning.

RED FLAGS ON SITE
  • More than the odd hollow tap in a room
  • Water pooling away from the bathroom drain
  • Grout lines wandering in width across the room
PRO TIP

Tile faults are cheap to fix before grouting and expensive after furniture arrives. Insist on a tap-test walkthrough at handover — we do one by default.

TRY IT · FREE LAB TOOLMaterial ListHow much tile and paint does each room need?Open the tool →
QUIZ · THREE QUESTIONS

Did it stick?

QUESTION 1 OF 3 A tile sounds hollow when tapped. What does that mean?
Ask our engineers on WhatsApp
Sources · checked 15 Nov 2026
  1. IS 15477:2019 Adhesives for Use with Ceramic, Glass and Stone Tiles, SpecificationChecked 15 Nov 2026
  2. IS 15622 Ceramic Tiles, SpecificationChecked 15 Nov 2026
  3. IS 1443:1972 Code of Practice for Laying and Finishing of Cement Concrete Flooring TilesChecked 15 Nov 2026
  4. CPWD Specifications, flooring itemsChecked 15 Nov 2026

Checked against these sources on the dates shown, pending our team’s sign-off. Rules change, so we check them again for your plot before anything is filed.