Skip to content
Delta Structures
EstimateFree estimate
02 · CORE CONSTRUCTION

Excavation, RCC, masonry, waterproofing, plaster and flooring: everything that makes the shell, built by our own site teams, with one firm answerable for all of it. Our supply and project-management teams feed the work, and every stage is inspected before the next one hides it.

*Indicative, not guaranteed. Timing varies with the complexity of your query.

25 SERVICES
Civil Contracting
  • 01Site Excavation & Foundation Work
  • 02RCC Structural Work
  • 03Brickwork & Masonry
  • 04Waterproofing (Roof, Basement, Walls)
  • 05Flooring, Tiling & Screeding
  • +20 more inside
See all 25
HOW A BUILD MOVES
  1. Soil test & design
  2. Foundation
  3. Plinth
  4. RCC frame
  5. Walls & services
  6. Finishes
  7. Handover
WHAT HAPPENS NEXT
  1. You tell us the jobA form, a WhatsApp message or a call.
  2. An engineer reviews itA free preliminary estimate, usually within 48 hours.*
  3. We visit and planA site visit (₹2,499, adjusted against the contract), then one plan and one contract.
HOW WE PRICE IT Three ways to pay for a build. Pick the one that fits.
  • Item-ratePAY FOR WHAT’S MEASURED
  • Turnkey (lump sum)ONE AGREED PRICE
  • Cost-plusOPEN BOOK
CHECK IT YOURSELF Six free checks on this page. Cost EstimatorWhat will your building cost?1 MINSeason PlannerStart in the right month, finish sooner.2 MINFoundation Type MatcherWhich foundation suits your ground?2 MIN
PRICING · NO SURPRISES

Our fees, before you ask.

Most jobs start free. Steps 2 and 3 are optional: take them when an engineer should see the site, or when you want every line priced.

  • No obligation
  • Each fee shown before you take the step
  • Fees come off your bill if you build with us
START HERE Usually 48 hours*

Free preliminary estimate

Best for: a new house on your plot, a boundary wall or driveway.

Free
No obligation
YOU GETAn outline of the work and a rough cost range for the services you picked.
  • An engineer reads your request
  • From your form, photos or drawings
  • No site visit needed

Nothing in this step costs you anything.

OPTIONAL One visit

In-depth assessment and site visit

Best for: waterproofing a roof or basement.

₹2,499/ visit
Across Kolkata · ₹4,999 for the outskirts, on request
YOU GETA written site assessment.
  • An engineer visits your site
  • An in-depth assessment of the site
  • Across Kolkata; the outskirts on request

Adjusted against the contract if you go ahead with us.

OPTIONAL A few business days

Detailed QTO & BOQ

Best for: every quantity for a bank loan.

On request
Quoted in writing before we start
YOU GETA line-by-line list of quantities and costs on our letterhead.
  • Every quantity counted from your drawings (QTO)
  • Every line priced (BOQ)
  • What banks accept for loans
  • Compare contractors item by item

Credited against your project bill if you build with us.

1 OF 3 · SWIPE

*Indicative, not guaranteed. Timing varies with the complexity of your query.The outskirts are the five areas we take on request.

FEES, PLAINLY

Questions about our fees

Because it needs no site visit. An engineer works from your form, photos and drawings, and sends an outline of the work and a rough cost range, usually within 48 hours.*

WHAT’S INCLUDED · 25 NAMED SERVICES

Every trade that makes the shell, in build order.

Each service is named in your quote, so you can see exactly what is in it. Tap any one to see what it covers.

1–4 of 25
Site Excavation & Foundation WorkDetailsPile Foundation WorkDetailsAnti-Termite Soil TreatmentDetailsSite Levelling & Earth FillingDetailsDemolition & Debris ManagementDetailsRCC Structural WorkDetailsShuttering & Formwork SystemsDetailsRebar Cutting, Bending & FixingDetailsCuring & Concrete Quality ManagementDetailsBrickwork & MasonryDetailsWaterproofing (Roof, Basement, Walls)DetailsPlastering & Wall FinishingDetailsFlooring, Tiling & ScreedingDetailsIndustrial & Warehouse FlooringDetailsStructural Steel, Grills & Gate FabricationDetailsSteel Sheds, Mezzanines & Roof StructuresDetailsElectrical Wiring, Earthing & PanelsDetailsPlumbing & Drainage InstallationDetailsUnderground & Overhead Water TanksDetailsSeptic Tanks & Soak PitsDetailsRainwater Harvesting & Recharge PitsDetailsBoundary Walls & Compound ConstructionDetailsRoads, Driveways & Pavement WorkDetailsPaver Block & Kerbstone LayingDetailsExternal Development WorksDetails
GROUP 01 / 06 · 5 SERVICESGROUP 02 / 06 · 4 SERVICESGROUP 03 / 06 · 3 SERVICESGROUP 04 / 06 · 4 SERVICESGROUP 05 / 06 · 2 SERVICESGROUP 06 / 06 · 7 SERVICES
Drag the orbit sideways, tap a group, or use ← →Swipe the orbit sideways, or tap a group
GROUP 01 / 06 · 5 SERVICES

Ground & substructure

  • We dig, shore and cast the base your whole structure rests on.

    Which foundation suits your ground? →
  • We cast bored piles to the engineer’s design and record every pile’s depth, with specialist piling partners for the rigs.

  • We lay the chemical barrier stage by stage to IS 6313, before the floor is closed.

  • We fill in layers and compact each one, so the ground doesn't settle for years.

  • We take structures down in a controlled way, salvage what can be reused and dispose of the rest legally.

GROUP 02 / 06 · 4 SERVICES

RCC frame

  • We cast the columns, beams and slabs of your frame and cure the concrete to grade.

    Pick the right concrete grade →
  • Our formwork is straight, tight and oiled, so the concrete takes the exact shape of its mould.

  • We follow the bar bending schedule to the millimetre, cover blocks included.

    Check the steel before the pour →
  • We record cube tests, slump checks and the curing schedule for every pour, and you can see the records.

    See the curing clock →
GROUP 03 / 06 · 3 SERVICES

Walls & envelope

  • We build walls plumb, level and properly bonded, and check them with tools, not by eye.

  • We apply the right system for each surface before the tiles hide the problem.

    Pick the right waterproofing system →
  • We plaster to an even thickness and cure it properly, so it takes paint without map cracking.

    Run the before-plaster checks →
GROUP 04 / 06 · 4 SERVICES

Floors & metalwork

  • We lay level bases with full mortar cover and the correct slopes, so no tile sounds hollow.

  • We lay vacuum-dewatered and trimix concrete floors with cut and sealed joints, for warehouses, workshops and parking.

  • We weld and finish the metalwork on site and prime it against rust.

  • We fabricate and erect steel sheds, mezzanine floors and roof structures to the engineer’s design, primed against rust.

GROUP 05 / 06 · 2 SERVICES

Wiring & plumbing

  • We lay the conduits, wire, earth and test every circuit, and hand you the readings and the as-built layout.

  • We lay the supply and waste lines, pressure-test them before the walls close and fit the sanitaryware.

GROUP 06 / 06 · 7 SERVICES

Water & site works

  • We build watertight RCC tanks, cured properly and coated inside.

  • We size them correctly, vent them and keep them easy to reach for cleaning.

  • We build the storage, filters and recharge pits to the design and connect them to your roof outlets.

  • We build the compound wall, the gates and the paving that finish your plot.

  • We build driveways from the sub-base up, so they don't sink in the first monsoon.

  • We lay pavers and kerbs from our catalogue on a compacted base, with edge restraint and a slope to drain.

  • We build the drains, culverts, paving and landscape edges that finish the site.

A contemporary Kolkata house with shaded balconies, exposed concrete and trees in front.
A building planned, engineered and built under one contract.
STAGE BY STAGE · 7 STAGES

How a build moves.

Skip the stages →
  1. Stage 01: Soil test & design

    The soil report and structural drawings come first.

  2. Stage 02: Foundation

    Excavation, PCC and RCC footings, set out to the drawing.

  3. Stage 03: Plinth

    Plinth beams, anti-termite treatment and the damp-proof course.

  4. Stage 04: RCC frame

    Columns, beams and slabs, one floor at a time, cubes tested.

  5. Stage 05: Walls & services

    Brickwork, then concealed plumbing and wiring, tested before plaster.

  6. Stage 06: Finishes

    Plaster, waterproofing, flooring and paint.

  7. Stage 07: Handover

    Pond tests, snag list, certificates and drawings handed over.

1 of 7
  1. Stage 01: Soil test & design

    The soil report and structural drawings come first.

  2. Stage 02: Foundation

    Excavation, PCC and RCC footings, set out to the drawing.

  3. Stage 03: Plinth

    Plinth beams, anti-termite treatment and the damp-proof course.

  4. Stage 04: RCC frame

    Columns, beams and slabs, one floor at a time, cubes tested.

  5. Stage 05: Walls & services

    Brickwork, then concealed plumbing and wiring, tested before plaster.

  6. Stage 06: Finishes

    Plaster, waterproofing, flooring and paint.

  7. Stage 07: Handover

    Pond tests, snag list, certificates and drawings handed over.

  1. Stage 01: Soil test & design

    The soil report and structural drawings come first.

  2. Stage 02: Foundation

    Excavation, PCC and RCC footings, set out to the drawing.

  3. Stage 03: Plinth

    Plinth beams, anti-termite treatment and the damp-proof course.

  4. Stage 04: RCC frame

    Columns, beams and slabs, one floor at a time, cubes tested.

  5. Stage 05: Walls & services

    Brickwork, then concealed plumbing and wiring, tested before plaster.

  6. Stage 06: Finishes

    Plaster, waterproofing, flooring and paint.

  7. Stage 07: Handover

    Pond tests, snag list, certificates and drawings handed over.

WATERPROOFING · ROOF TO BASEMENT

Waterproofing in Kolkata, surface by surface.

The monsoon finds every weak joint. We waterproof as we build and fix leaks in buildings that already stand: the right system for each surface, laid before tiles or plaster hide it, and tested before we move on.

1 of 6
  • 01

    Roof and terrace

    We check the slope and the outlets first, then lay a seamless liquid membrane that bridges the daily hairline cracks, turned up the parapet and pond-tested before anything covers it.

    Read the guide →
  • 02

    Bathrooms and kitchens

    A two-part cementitious coat over the sunken slab, up the walls and around every pipe and drain, then a pond test before the tiles go on.

    Read the guide →
  • 03

    Basement and underground tank

    Below ground, water pushes in under pressure. We waterproof the concrete itself, tank the walls from outside and seal every construction joint.

    Read the guide →
  • 04

    External walls and facade

    We fill the cracks and make the plaster sound, then apply a flexible coat that keeps driving rain out of the brickwork.

    Read the guide →
  • 05

    Overhead water tank

    A food-safe coat inside, so the tank holds water without tainting it, with the inlet, outlet and overflow pipes sealed where they pass through.

    Read the guide →
  • 06

    Balconies and planters

    Wet soil sits on the slab all year. We lay a root-resistant membrane, a drainage layer and outlets that stay clear.

    Read the guide →
Already leaking? Find the cause first.

A damp patch can be a leak, rising damp or condensation, and each needs a different fix. Our free checks help you tell them apart, or we can come and look.

WALL FINISHES · 432 TEXTURES

Finish the walls in a texture.

Once the plaster is sound, a texture coat gives the wall its look. Browse textures for facades and rooms, shortlist the ones you like and send them to us.

AROUND THE HOUSE · 35 PAVER PRODUCTS

Pave the drive, the path and the garden.

Paver blocks, pattern tiles, grass pavers, kerbstones and drains for the ground around your house, each shown in a setting. Browse them by colour, shortlist the ones you like and send them to us.

HOW YOU CAN CONTRACT WITH US

Three ways to pay for a build. Pick the one that fits.

We offer item-rate, turnkey and cost-plus contracts. Each suits a different kind of project; here is how they compare.

1 of 3
PAY FOR WHAT’S MEASURED Item-rate

You pay agreed rates for measured quantities: per cubic metre of concrete, per square metre of plaster, per running metre of beam.

Price certainty
Flexibility
Transparency

Suits: Projects where drawings may still change, or owners who want to see every quantity.

Watch: The final cost follows the final quantities, so measurements must be recorded and agreed.

ONE AGREED PRICE Turnkey (lump sum)

One fixed price for a defined scope, worked out from complete drawings and specifications.

Price certainty
Flexibility
Transparency

Suits: Owners with final drawings and specifications who want a single number.

Watch: Changes after signing become variations, so lock your decisions early.

OPEN BOOK Cost-plus

You pay the actual cost of materials and labour, with the bills shared, plus an agreed fee.

Price certainty
Flexibility
Transparency

Suits: Renovations and projects with unknowns, where the scope can’t be fixed up front.

Watch: The total isn’t fixed, so it works best with clear records and regular reviews.

PAY FOR WHAT’S MEASURED Item-rate

You pay agreed rates for measured quantities: per cubic metre of concrete, per square metre of plaster, per running metre of beam.

Price certainty
Flexibility
Transparency

Suits: Projects where drawings may still change, or owners who want to see every quantity.

Watch: The final cost follows the final quantities, so measurements must be recorded and agreed.

ONE AGREED PRICE Turnkey (lump sum)

One fixed price for a defined scope, worked out from complete drawings and specifications.

Price certainty
Flexibility
Transparency

Suits: Owners with final drawings and specifications who want a single number.

Watch: Changes after signing become variations, so lock your decisions early.

OPEN BOOK Cost-plus

You pay the actual cost of materials and labour, with the bills shared, plus an agreed fee.

Price certainty
Flexibility
Transparency

Suits: Renovations and projects with unknowns, where the scope can’t be fixed up front.

Watch: The total isn’t fixed, so it works best with clear records and regular reviews.

BUILDING NEAR YOU · 20 AREA GUIDES

Every locality has its own rules and ground.

Pick your area to see who approves your plan and what the ground is like. The full guide has the sanction steps, local facts and offices.

Garia, Patuli, Mukundapur & AjoynagarJadavpur, Baghajatin & SantoshpurTollygunge, Regent Park, Bansdroni, Naktala & HaridevpurBehala, Thakurpukur & JokaKasba, EM Bypass, Kalikapur, Anandapur, Picnic Garden & TiljalaBallygunge, Alipore, Bhowanipore & KalighatLake Gardens, Golf Green, Dhakuria & SelimpurGarden Reach, Maheshtala & Budge BudgeSonarpur, Narendrapur, Harinavi, Subhashgram, Mallickpur & ChampahatiRajpur, Baruipur & KamalgaziBishnupur, Amtala & Diamond HarbourCentral Kolkata: Park Street, Esplanade, Sealdah, Entally & BeliaghataNorth Kolkata: Shyambazar, Bagbazar, Shobhabazar, Maniktala, Ultadanga, Phoolbagan & KankurgachiBaranagar, Sinthi, Belgharia, Dum Dum, Nagerbazar & BiratiSalt Lake, Lake Town & Bangur AvenueNew Town, Rajarhat, Kestopur, Baguiati, Teghoria, Kaikhali & Chinar ParkMadhyamgram & BarasatSodepur, Agarpara, Khardah, Titagarh & BarrackporeHowrah, Shibpur, Santragachi, Liluah, Bally, Andul, Domjur & UluberiaHooghly: Dankuni, Uttarpara, Serampore & Chandannagar

WHO APPROVES YOUR PLANGaria is split between Kolkata Municipal Corporation and Rajpur Sonarpur Municipality.The cluster is within Kolkata Municipal Corporation, split across Boroughs X, XI and XII.The cluster is within Kolkata Municipal Corporation, across Boroughs X, XI and XIII.Behala is within Kolkata Municipal Corporation, across Boroughs XIII, XIV and XVI.The cluster is within Kolkata Municipal Corporation, across four boroughs.The cluster is within Kolkata Municipal Corporation, across Boroughs VIII, IX and X.Every ward in the cluster is in Kolkata Municipal Corporation’s Borough X.Three civic bodies share the cluster.Most of the cluster is in Rajpur Sonarpur Municipality, one of the state’s oldest.Two municipalities and the gram panchayats around them.One municipality, then gram panchayats.All of it is Kolkata Municipal Corporation, across four boroughs.All of it is Kolkata Municipal Corporation, across three boroughs.Six civic bodies: one corporation and five municipalities.Three bodies: the corporation, the IT township authority and a municipality.NKDA inside New Town, the municipal corporation along VIP Road.Two municipalities, then gram panchayats.Four municipalities and a cantonment board.A corporation, two municipalities, then gram panchayats.A corporation and six municipalities.

THE GROUNDMuch of Patuli is urbanised wetland on clayey, alluvial soil.Santoshpur was shallow marsh and farmland until the 1970s.Much of the cluster was forest, swamp and ponds not long ago.Behala was once part of the Sundarbans, and parts of it are filled marsh.Much of the Bypass side was wetland until the 1980s.The lake was dug out of marsh, and Kalighat sits on the old river course.Low, flat land between a lake and a golf course, and heavy monsoon bursts.Low delta land on the east bank of the Hooghly.Flat delta land along the silted course of the Adi Ganga.The Baruipur–Jaynagar plain, laid down by the old river.Low river plain, and arsenic in some groundwater.Old fill over soft, water-bearing ground.Old riverside ground in the west, reclaimed salt marsh in the east.Riverbank mills and ghats in the west, slightly higher ground at Dum Dum.Salt Lake is reclaimed marsh, filled with river silt.New Town was built on farmland and water bodies.Flat delta land, just above flood level.Riverside delta land, with arsenic in some groundwater.Low, wet ground: Howrah is named after a marsh.The Hooghly rises every monsoon, so riverside plots need flood-aware plinth levels and drainage. The area guide has the details.

Open the Garia guide →Open the Jadavpur guide →Open the Tollygunge guide →Open the Behala guide →Open the Kasba guide →Open the Ballygunge guide →Open the Lake Gardens guide →Open the Garden Reach guide →Open the Sonarpur guide →Open the Baruipur guide →Open the Diamond Harbour guide →Open the Central Kolkata guide →Open the North Kolkata guide →Open the Baranagar & Dum Dum guide →Open the Salt Lake & Lake Town guide →Open the New Town & Rajarhat guide →Open the Madhyamgram & Barasat guide →Open the Sodepur to Barrackpore guide →Open the Howrah guide →Open the Hooghly riverside guide →
KNOWLEDGE HUB · CALCULATORS

Read up before you build.

GUIDEStructural crack vs shrinkage crackThin (under 1mm), random or map-patterned, and only skin-deep in the plaster = shrinkage, usually cosmetic. Wide (3mm+), directional (diagonal from window corners, long horizontals, stepped through brick joints), passing through the wall, or growing over time = possibly structural — get it assessed.GUIDEWhy concrete needs 28 days (and daily water)Concrete doesn't 'dry' — it hardens by a chemical reaction (hydration) that needs water. It reaches roughly two-thirds of its strength in 7 days and its full design strength at 28 days. Skipping the daily watering, or removing slab supports early, permanently weakens it.GUIDERising damp vs leakage vs condensationThree different problems that look similar and need completely different fixes. A tide-mark rising from the floor = rising damp. A localized patch near a bathroom, roof or pipe that grows after rain or use = leakage. Fuzzy black spots in corners and behind furniture in humid months = condensation.GUIDEWaterproofing options, decodedThere's no single 'waterproofing' — there are systems matched to surfaces: brush-applied cementitious or acrylic coatings for bathrooms and small terraces, torch-applied membrane sheets for large roofs, injection grouting for active leaks in concrete, and crystalline admixtures mixed into new concrete itself.GUIDE5 on-site brick quality checksGood bricks ring, survive a drop, don't drink like a sponge, and match each other. You can test all of this at delivery in ten minutes, before a single brick goes into your wall.GUIDETile work red flags — the hollow-tap test & moreTap every tile with a coin or key: a hollow sound means voids under it — that tile will crack or pop loose. Also check edges sit flush (no 'lippage'), joints are even, and bathroom floors slope TO the drain, not away from it.GUIDEWaterproofing options, decodedThere's no single 'waterproofing' — there are systems matched to surfaces: brush-applied cementitious or acrylic coatings for bathrooms and small terraces, torch-applied membrane sheets for large roofs, injection grouting for active leaks in concrete, and crystalline admixtures mixed into new concrete itself.GUIDE5 on-site brick quality checksGood bricks ring, survive a drop, don't drink like a sponge, and match each other. You can test all of this at delivery in ten minutes, before a single brick goes into your wall.GUIDETile work red flags — the hollow-tap test & moreTap every tile with a coin or key: a hollow sound means voids under it — that tile will crack or pop loose. Also check edges sit flush (no 'lippage'), joints are even, and bathroom floors slope TO the drain, not away from it.
1 of 6
1 of 6
Brick & Mortar CalculatorWall size → bricks, cement, sandOpen the calculator →
Slab Concrete CalculatorSlab size → cement, sand, aggregateOpen the calculator →
Slab Steel EstimatorSlab volume → TMT weightOpen the calculator →
Plaster Material CalculatorWall area → cement & sandOpen the calculator →
Concrete Grade SelectorExposure → min grade per IS 456Try it on this page →
Excavation & Earthwork EstimatorFootprint & depth → soil volume, tripsOpen the calculator →
ASK DELTA · ENGLISH · বাংলা · हिंदी

Ask Delta anything.

Contract types, soil tests, concrete grades, quality checks and site safety, answered from our published guides.

Questions about building with us

Item-rate, turnkey (lump sum) and cost-plus. At the free consultation we look at your drawings and decisions so far, and suggest the one that fits.

Structure and finishes for a typical Kolkata residence at our standard rates, ±8%. It excludes land, sanction fees, interiors and unusual site conditions. Your free preliminary estimate replaces it with numbers for your plot.

Starting after the monsoon, between October and January, usually keeps excavation and foundations out of the heaviest rain. The season planner above shows how the start month changes the schedule for your size of building.

The structural design decides. For most Kolkata homes M25 is the structural default; water tanks, wet areas and severe exposure need M30 or above under IS 456.

Yes. Foundations are designed by a structural engineer from a soil investigation report. The Foundation Type Matcher shows the likely options; the soil test confirms the choice.

The consultation and the preliminary estimate are free. An in-depth assessment and site visit is ₹2,499 across Kolkata (₹4,999 for the outskirts, on request), adjusted against the contract if you go ahead with us. A detailed QTO and BOQ is priced on request.

WE’RE NEW · HERE IS HOW YOU CAN CHECK US

Start with a free preliminary estimate.

Tell us your plot, floors and finish. The consultation and the preliminary estimate are free (usually within 48 hours*). An in-depth assessment and site visit is ₹2,499 (₹4,999 for the outskirts), adjusted against the contract if you go ahead with us.

Your requestA few lines. An engineer reads it.
What would you like?
Prefer the full estimate form, step by step? →

WhatsApp opens with your request ready. Nothing is sent until you press send there.Send by email

Monday to Saturday, 10am to 7pm IST.Free preliminary estimate, usually within 48 hours.*

Search or ask Delta