- 01Site Excavation & Foundation Work
- 02RCC Structural Work
- 03Brickwork & Masonry
- 04Waterproofing (Roof, Basement, Walls)
- 05Flooring, Tiling & Screeding
- +20 more inside
Excavation, RCC, masonry, waterproofing, plaster and flooring: everything that makes the shell, built by our own site teams, with one firm answerable for all of it. Our supply and project-management teams feed the work, and every stage is inspected before the next one hides it.
*Indicative, not guaranteed. Timing varies with the complexity of your query.
- Soil test & design
- Foundation
- Plinth
- RCC frame
- Walls & services
- Finishes
- Handover
- You tell us the jobA form, a WhatsApp message or a call.
- An engineer reviews itA free preliminary estimate, usually within 48 hours.*
- We visit and planA site visit (₹2,499, adjusted against the contract), then one plan and one contract.
- Item-ratePAY FOR WHAT’S MEASURED
- Turnkey (lump sum)ONE AGREED PRICE
- Cost-plusOPEN BOOK
Our fees, before you ask.
Most jobs start free. Steps 2 and 3 are optional: take them when an engineer should see the site, or when you want every line priced.
- No obligation
- Each fee shown before you take the step
- Fees come off your bill if you build with us
*Indicative, not guaranteed. Timing varies with the complexity of your query.The outskirts are the five areas we take on request.
Questions about our fees
Because it needs no site visit. An engineer works from your form, photos and drawings, and sends an outline of the work and a rough cost range, usually within 48 hours.*
Every trade that makes the shell, in build order.
Each service is named in your quote, so you can see exactly what is in it. Tap any one to see what it covers.
Ground & substructure
How a build moves.
Waterproofing in Kolkata, surface by surface.
The monsoon finds every weak joint. We waterproof as we build and fix leaks in buildings that already stand: the right system for each surface, laid before tiles or plaster hide it, and tested before we move on.
A damp patch can be a leak, rising damp or condensation, and each needs a different fix. Our free checks help you tell them apart, or we can come and look.
Three ways to pay for a build. Pick the one that fits.
We offer item-rate, turnkey and cost-plus contracts. Each suits a different kind of project; here is how they compare.
Read up before you build.
Ask Delta anything.
Contract types, soil tests, concrete grades, quality checks and site safety, answered from our published guides.
Questions about building with us
Start with a free preliminary estimate.
Tell us your plot, floors and finish. The consultation and the preliminary estimate are free (usually within 48 hours*). An in-depth assessment and site visit is ₹2,499 (₹4,999 for the outskirts), adjusted against the contract if you go ahead with us.
ENGINEER-LEDAn engineer reads every request.Founded and led by Raj Sekhar Ghosh, civil engineer.About us →
FEES IN WRITINGEvery fee, before you take a step.The estimate is free, the visit is ₹2,499, and the BOQ fee is quoted in writing before we start.How we work →CHECK IT YOURSELF37 free tools and 55 calculators.Try the checks we use before you talk to anyone. No sign-up.Open the Lab →SOURCES AND DATESEvery fact has a source and a checked date.Across 112 guides, so you can check what we say.Read the guides →ONE CONTRACTOne firm, one contract.Design, build and supply under one contract: item-rate, turnkey or cost-plus.The contract types →OFFICE HOURSMonday to Saturday, 10am to 7pm IST.Our office is in Garia. Closed on Sundays and holidays.Contact us →







