Skip to content
Delta Structures
EstimateFree estimate
01 · DESIGN & COMPLIANCE

Structural design, soil investigation, drawings, sanction filing and costing, from engineers who also build. What we draw goes straight to our own site teams, so nothing is lost between the drawing and the site.

*Indicative, not guaranteed. Timing varies with the complexity of your query.

28 SERVICES
Engineering Consultancy
  • 01Plan to 3D Visualisation
  • 02Model-Linked BOQ & Quantities
  • 03Construction Sequence & Walkthrough
  • 04Structural Design & Analysis
  • 05Soil Testing & Geotechnical Investigation
  • +23 more inside
See all 28
HOW A DESIGN JOB MOVES
  1. Brief and site visit
  2. Survey and soil test
  3. Plan within the rules
  4. Structure and services
  5. Sanction and GFC set
  6. Quantities and site support
WHAT HAPPENS NEXT
  1. You tell us the jobA form, a WhatsApp message or a call.
  2. An engineer reviews itA free preliminary estimate, usually within 48 hours.*
  3. We visit and planA site visit (₹2,499, adjusted against the contract), then one plan and one contract.
HOW WE PRICE IT Design alone, or design and build.
  • Item-rateFor single services
  • Turnkey (lump sum)Usual for design work
  • Cost-plusFor open-ended studies
CHECK IT YOURSELF See the engineering for yourself. Soil BearingWill your ground carry your house?3 MINSlab Span & Depth CheckerIs your slab thick enough for its span?3 MINBeam StressSee where a beam works hardest.2 MIN
PRICING · NO SURPRISES

Our fees, before you ask.

Most jobs start free. Steps 2 and 3 are optional: take them when an engineer should see the site, or when you want every line priced.

  • No obligation
  • Each fee shown before you take the step
  • Fees come off your bill if you build with us
START HERE Usually 48 hours*

Free preliminary estimate

Best for: a plot that needs drawings, a second opinion on a design.

Free
No obligation
YOU GETAn outline of the work and a rough cost range for the services you picked.
  • An engineer reads your request
  • From your form, photos or drawings
  • No site visit needed

Nothing in this step costs you anything.

OPTIONAL One visit

In-depth assessment and site visit

Best for: a soil test before design, a check before you buy.

₹2,499/ visit
Across Kolkata · ₹4,999 for the outskirts, on request
YOU GETA written site assessment.
  • An engineer visits your site
  • An in-depth assessment of the site
  • Across Kolkata; the outskirts on request

Adjusted against the contract if you go ahead with us.

OPTIONAL A few business days

Detailed QTO & BOQ

Best for: a bank loan, or comparing contractors item by item.

On request
Quoted in writing before we start
YOU GETA line-by-line list of quantities and costs on our letterhead.
  • Every quantity counted from your drawings (QTO)
  • Every line priced (BOQ)
  • What banks accept for loans
  • Compare contractors item by item

Credited against your project bill if you build with us.

1 OF 3 · SWIPE

*Indicative, not guaranteed. Timing varies with the complexity of your query.The outskirts are the five areas we take on request.

FEES, PLAINLY

Questions about our fees

Because it needs no site visit. An engineer works from your form, photos and drawings, and sends an outline of the work and a rough cost range, usually within 48 hours.*

WHAT’S INCLUDED · 28 NAMED SERVICES

From the first survey to the drawing the site builds from.

Each service is named in your quote, so you can see exactly what is in it. Tap one to see what happens on site.

1–4 of 28
Site Survey & Contour MappingDetailsSoil Testing & Geotechnical InvestigationDetailsCost Estimation & Feasibility StudiesDetailsConcrete Testing & NDTDetailsArchitectural Planning & DrawingsDetailsStructural Design & AnalysisDetailsFoundation Design: Shallow, Raft & PileDetailsRetaining Wall & Slope Protection DesignDetailsMEP DesignDetailsGood-For-Construction (GFC) Drawing SetsDetailsVastu-Aligned Plan AdaptationDetailsAs-Built Drawings & Plan Deviation CheckDetailsPlan to 3D VisualisationDetailsModel-Linked BOQ & QuantitiesDetailsConstruction Sequence & WalkthroughDetailsQTO & BOQ PreparationDetailsValue Engineering & Design OptimisationDetailsRate Analysis & Tender DocumentationDetailsMunicipal Plan Sanction & Approval LiaisonDetailsStructural Safety & Compliance ConsultingDetailsStructural Audit & Stability CertificationDetailsPeer Review of Third-Party DesignsDetailsPre-Purchase Building InspectionDetailsCompletion & Occupancy Certificate SupportDetailsDamage Assessment & Technical ReportsDetailsRainwater Harvesting System DesignDetailsSeptic Tank & Drainage System DesignDetailsConstruction Methodology & Sequencing AdviceDetails
GROUP 01 / 05 · 4 SERVICESGROUP 02 / 05 · 8 SERVICESGROUP 03 / 05 · 6 SERVICESGROUP 04 / 05 · 7 SERVICESGROUP 05 / 05 · 3 SERVICES
Drag the orbit sideways, tap a group, or use ← →Swipe the orbit sideways, or tap a group
GROUP 01 / 05 · 4 SERVICES

Site, soil and feasibility

  • We measure your plot and its levels: the starting point every design needs.

    ON SITEBoundaries, levels and existing features measured on the plot and drawn to scale, so the design starts from what is really there.

  • We test the soil under your plot before we design the footing that sits on it.

    ON SITEBore holes to the depth the building needs, standard penetration tests and samples for the lab; the report gives the bearing capacity, the soil layers and the water table.

    Will your ground carry your house? Soil Bearing →
  • Before you commit, we tell you whether it will work, what it will cost and whether it is worth it.

    ON SITEWhat the rules let you build on the plot, an indicative cost and the order of work, before you commit to a design.

    What will your building cost? Cost Estimator →
  • We test standing concrete with a rebound hammer, ultrasonic pulse, cover and carbonation checks, and cores through a testing lab where they are needed.

    ON SITEThe members to test are chosen from the survey; rebound hammer and ultrasonic pulse readings map the concrete’s quality, a cover meter finds the bars, a pink test on a fresh break shows how deep carbonation has gone, and cores go to a testing lab where strength must be measured.

GROUP 02 / 05 · 8 SERVICES

Design and drawings

  • We draw layouts and working drawings that balance space, light, cost and the rules for your plot.

    ON SITELayouts that fit the FAR, ground coverage, open spaces and height allowed on your plot, then working drawings with every dimension the site needs.

    How much can you build? KMC Building Rules →
  • We design the RCC or steel frame and show you the load calculations that keep the building standing.

    ON SITELoads are worked out floor by floor and the frame is designed to IS 456 and IS 1893 for Seismic Zone III, with IS 13920 detailing where the code asks for it.

    Column, beam, slab: how your building stands up →
  • We match the foundation to your soil report, not to habit: shallow footings, a raft or piles.

    ON SITEThe foundation type and size come from the soil report and the loads: isolated footings, a raft or piles, designed to IS 1904 and, for piles, IS 2911.

    Isolated, raft or piles →
  • We engineer retaining walls for level differences and waterlogged plots, so the earth stays where it is.

    ON SITEWalls designed for the soil and water behind them, with drainage and weep holes, so a level difference or a pond next door stays where it is.

  • We plan the wiring, plumbing and mechanical services before the walls go up, so nothing is cut in later.

    ON SITEElectrical points, loads and circuits, plumbing and drainage lines, and AC routes drawn together, so they don’t clash with beams or with each other.

    Switchboard heights and socket counts →
  • You get revision-controlled working drawings that the site actually builds from.

    ON SITEOne numbered, dated set the site builds from, with a register of every sheet and revision; drafts are never sent to site.

    How to read your structural drawings →
  • We reconcile your Vastu orientation preferences with the logic of the structure.

    ON SITEYour preferred directions planned in at the design stage, with the columns and beams kept where the structure needs them.

    When Vaastu and structural safety collide →
  • We measure what was actually built, draw it, and show you where it differs from the sanctioned plan.

    ON SITEThe building is measured floor by floor and drawn as it stands; the drawings are laid over the sanctioned plan, and every difference in coverage, height, setbacks and floors is listed, so you know where you stand before a sale, a loan or new work.

GROUP 03 / 05 · 6 SERVICES

3D, quantities and cost

  • We rebuild your sanctioned plan as an accurate 3D model, with views, sections and X-ray studies, so you see the building before it is built.

    ON SITEWe rebuild your sanctioned plan as a 3D model to scale, with views and sections of the rooms you ask for, so you can see the building before it is built.

  • We take concrete, steel, brick and finish quantities straight from the 3D model, so your quantities are measured, not guessed off a 2D sheet.

    ON SITEConcrete, steel, brick and finish quantities are taken from the model element by element, so the list matches the drawings rather than a guess off one sheet.

    What a BOQ should list →
  • You watch the building go up stage by stage, and walk through photoreal renders before a brick is laid.

    ON SITEThe building assembles stage by stage on screen, from footings to finishes, so you and the site team agree the order of work before it starts.

  • Our engineers take off the quantities and prepare your bill of quantities. Its price is on request, adjusted in full against the project cost if you go ahead with us.

    ON SITEQuantities measured from the drawings item by item, each with its specification, so every quote you collect prices the same thing.

  • We find a better specification that performs the same: your cost comes down, the safety does not.

    ON SITEWe look for the same strength with less material, for example a better column grid, beam depths or a mix design, and never by cutting the safety margins.

  • We build up itemised rates and the tender papers, so the bids you get can be compared line by line.

    ON SITEEach item’s rate built up from material, labour and plant, and tender papers that make every bid comparable line by line.

    Compare quotes with the Cost-per-Sq-Ft Benchmarker →
GROUP 04 / 05 · 7 SERVICES

Approvals and second opinions

  • We prepare, file and follow up your plan sanction with the corporation, so you never queue at the counters.

    ON SITEWe prepare the drawings and forms, file them with KMC or your municipality, answer the queries and follow the file until the plan is sanctioned.

    How to read your sanctioned plan →
  • We check an existing or ongoing structure against the code, independently, and tell you where it falls short.

    ON SITEAn engineer checks a building under construction or already standing against its drawings and the codes, and writes down what is safe and what needs fixing.

    Check before it gets buried: Site Readiness →
  • You get a formal stability report for your society, bank or the authority, signed and stamped by qualified engineers.

    ON SITEA visual survey, tests where they are needed (concrete strength, cover, carbonation) and a stability report signed by a qualified engineer.

    Structural audit: when your old building needs one →
  • We give you a second engineering opinion on drawings you already have.

    ON SITEAn independent engineer reads the drawings you already have, checks loads, sizes and detailing against the codes, and lists what to correct.

    Is your slab thick enough? Slab Span →
  • Before you buy a flat or an old house, our engineers check its structure, damp, wiring and plumbing, and tell you what it will need.

    ON SITEAn engineer walks the flat or house and its common parts with you or for you: cracks, damp, rust, the wiring, the plumbing and the terrace, and checks what is built against the sanctioned plan you have. A short report lists what we found, how urgent each item is and what it will need.

  • We prepare the drawings, certificates and papers the authority asks for when the building is finished, and follow the application through.

    ON SITEOnce the building is finished, the completion drawings and the engineers’ certificates are prepared, the application is filed with the authority, and the inspection and any queries are followed up with the authority.

  • We record damage, its likely cause and the repair in a dated, signed report, for a neighbour, an association, an insurer or a dispute.

    ON SITEThe damage is photographed, measured and dated, the likely cause is traced (a leak next door, digging alongside, settlement), and a signed report sets out what we found, what caused it in our view and what the repair involves.

GROUP 05 / 05 · 3 SERVICES

Water, drainage and method

  • We size the recharge pits and storage to your roof and the local rules.

    ON SITERecharge pits or storage sized to your roof area and Kolkata’s rainfall, with the overflow and silt traps placed where they can be cleaned.

    Rainwater harvesting and site drainage →
  • We design the waste lines, the septic tank and the soak pits to code.

    ON SITEWaste lines with the right falls, a septic tank sized for the people using it and a soak pit placed away from the water source.

    Size it with the Septic Tank Sizer →
  • We plan how it gets built before day one: the staging, access and temporary works.

    ON SITEStaging, site access, shoring and propping planned before day one, so the work runs in a safe and sensible order.

    Start in the right month: Season Planner →
A concrete cube in a compression testing machine, with test cubes on the bench.
The checks behind a design: tests, surveys and calculations.
STAGE BY STAGE · 6 STAGES

How a design job moves.

Skip the stages →
  1. Stage 01: Brief and site visit

    We hear what you want to build, walk the plot and collect the deed, any old plans and the road width.

  2. Stage 02: Survey and soil test

    A measured survey with levels, and a soil investigation that gives the bearing capacity and the water table.

  3. Stage 03: Plan within the rules

    Layouts to compare, checked against the FAR, ground coverage, open spaces and height allowed on your plot.

  4. Stage 04: Structure and services

    Frame, foundation and MEP designed together, with the loads worked out for Seismic Zone III.

  5. Stage 05: Sanction and GFC set

    We file the sanction and follow it up, then issue the signed Good For Construction drawings.

  6. Stage 06: Quantities and site support

    Quantities and a BOQ from the drawings, then answers and checks on site while it is built.

1 of 6
  1. Stage 01: Brief and site visit

    We hear what you want to build, walk the plot and collect the deed, any old plans and the road width.

  2. Stage 02: Survey and soil test

    A measured survey with levels, and a soil investigation that gives the bearing capacity and the water table.

  3. Stage 03: Plan within the rules

    Layouts to compare, checked against the FAR, ground coverage, open spaces and height allowed on your plot.

  4. Stage 04: Structure and services

    Frame, foundation and MEP designed together, with the loads worked out for Seismic Zone III.

  5. Stage 05: Sanction and GFC set

    We file the sanction and follow it up, then issue the signed Good For Construction drawings.

  6. Stage 06: Quantities and site support

    Quantities and a BOQ from the drawings, then answers and checks on site while it is built.

  1. Stage 01: Brief and site visit

    We hear what you want to build, walk the plot and collect the deed, any old plans and the road width.

  2. Stage 02: Survey and soil test

    A measured survey with levels, and a soil investigation that gives the bearing capacity and the water table.

  3. Stage 03: Plan within the rules

    Layouts to compare, checked against the FAR, ground coverage, open spaces and height allowed on your plot.

  4. Stage 04: Structure and services

    Frame, foundation and MEP designed together, with the loads worked out for Seismic Zone III.

  5. Stage 05: Sanction and GFC set

    We file the sanction and follow it up, then issue the signed Good For Construction drawings.

  6. Stage 06: Quantities and site support

    Quantities and a BOQ from the drawings, then answers and checks on site while it is built.

FREE CHECKS · FROM OUR LAB

See the engineering for yourself.

Whether your ground can carry the house, whether a slab is thick enough for its span, and where a beam works hardest. Each check takes a few minutes, and the result is yours to keep or send to us.

1 of 3
HOW YOU CAN CONTRACT WITH US

Design alone, or design and build.

A design job is usually one agreed fee for a defined set of drawings. Single services, such as a soil test, a survey or a peer review, are priced on their own; when we also build what we designed, the design sits inside the building contract.

1 of 3
PAY FOR WHAT’S MEASUREDFor single services

Item-rate

You pay agreed rates for measured quantities: per square metre of tiling or plaster, per point of wiring, per running metre of pipe.

Price certainty
Flexibility
Transparency

Suits: A soil test, a survey, a structural check or a peer review, each priced on its own.

Watch: The final cost follows the final quantities, so measurements must be recorded and agreed.

ONE AGREED PRICEUsual for design work

Turnkey (lump sum)

One fixed price for a defined scope, worked out from complete drawings and specifications.

Price certainty
Flexibility
Transparency

Suits: A full set, from the survey and soil test to the sanction file and the GFC drawings, for one agreed fee.

Watch: Changes after signing become variations, so lock your decisions early.

OPEN BOOKFor open-ended studies

Cost-plus

You pay the actual cost of materials and labour, with the bills shared, plus an agreed fee.

Price certainty
Flexibility
Transparency

Suits: Audits and investigations where the number of tests depends on what the first ones find.

Watch: The total isn’t fixed, so it works best with clear records and regular reviews.

PAY FOR WHAT’S MEASUREDFor single services

Item-rate

You pay agreed rates for measured quantities: per square metre of tiling or plaster, per point of wiring, per running metre of pipe.

Price certainty
Flexibility
Transparency

Suits: A soil test, a survey, a structural check or a peer review, each priced on its own.

Watch: The final cost follows the final quantities, so measurements must be recorded and agreed.

ONE AGREED PRICEUsual for design work

Turnkey (lump sum)

One fixed price for a defined scope, worked out from complete drawings and specifications.

Price certainty
Flexibility
Transparency

Suits: A full set, from the survey and soil test to the sanction file and the GFC drawings, for one agreed fee.

Watch: Changes after signing become variations, so lock your decisions early.

OPEN BOOKFor open-ended studies

Cost-plus

You pay the actual cost of materials and labour, with the bills shared, plus an agreed fee.

Price certainty
Flexibility
Transparency

Suits: Audits and investigations where the number of tests depends on what the first ones find.

Watch: The total isn’t fixed, so it works best with clear records and regular reviews.

WORKING NEAR YOU · 20 AREA GUIDES

Every locality has its own rules and ground.

Pick your area to see who approves your plan and what the ground is like. The ground decides the foundation; the area guide has the sanction steps and offices.

Garia, Patuli, Mukundapur & AjoynagarJadavpur, Baghajatin & SantoshpurTollygunge, Regent Park, Bansdroni, Naktala & HaridevpurBehala, Thakurpukur & JokaKasba, EM Bypass, Kalikapur, Anandapur, Picnic Garden & TiljalaBallygunge, Alipore, Bhowanipore & KalighatLake Gardens, Golf Green, Dhakuria & SelimpurGarden Reach, Maheshtala & Budge BudgeSonarpur, Narendrapur, Harinavi, Subhashgram, Mallickpur & ChampahatiRajpur, Baruipur & KamalgaziBishnupur, Amtala & Diamond HarbourCentral Kolkata: Park Street, Esplanade, Sealdah, Entally & BeliaghataNorth Kolkata: Shyambazar, Bagbazar, Shobhabazar, Maniktala, Ultadanga, Phoolbagan & KankurgachiBaranagar, Sinthi, Belgharia, Dum Dum, Nagerbazar & BiratiSalt Lake, Lake Town & Bangur AvenueNew Town, Rajarhat, Kestopur, Baguiati, Teghoria, Kaikhali & Chinar ParkMadhyamgram & BarasatSodepur, Agarpara, Khardah, Titagarh & BarrackporeHowrah, Shibpur, Santragachi, Liluah, Bally, Andul, Domjur & UluberiaHooghly: Dankuni, Uttarpara, Serampore & Chandannagar

WHO APPROVES YOUR PLANGaria is split between Kolkata Municipal Corporation and Rajpur Sonarpur Municipality.The cluster is within Kolkata Municipal Corporation, split across Boroughs X, XI and XII.The cluster is within Kolkata Municipal Corporation, across Boroughs X, XI and XIII.Behala is within Kolkata Municipal Corporation, across Boroughs XIII, XIV and XVI.The cluster is within Kolkata Municipal Corporation, across four boroughs.The cluster is within Kolkata Municipal Corporation, across Boroughs VIII, IX and X.Every ward in the cluster is in Kolkata Municipal Corporation’s Borough X.Three civic bodies share the cluster.Most of the cluster is in Rajpur Sonarpur Municipality, one of the state’s oldest.Two municipalities and the gram panchayats around them.One municipality, then gram panchayats.All of it is Kolkata Municipal Corporation, across four boroughs.All of it is Kolkata Municipal Corporation, across three boroughs.Six civic bodies: one corporation and five municipalities.Three bodies: the corporation, the IT township authority and a municipality.NKDA inside New Town, the municipal corporation along VIP Road.Two municipalities, then gram panchayats.Four municipalities and a cantonment board.A corporation, two municipalities, then gram panchayats.A corporation and six municipalities.

THE GROUNDMuch of Patuli is urbanised wetland on clayey, alluvial soil.Santoshpur was shallow marsh and farmland until the 1970s.Much of the cluster was forest, swamp and ponds not long ago.Behala was once part of the Sundarbans, and parts of it are filled marsh.Much of the Bypass side was wetland until the 1980s.The lake was dug out of marsh, and Kalighat sits on the old river course.Low, flat land between a lake and a golf course, and heavy monsoon bursts.Low delta land on the east bank of the Hooghly.Flat delta land along the silted course of the Adi Ganga.The Baruipur–Jaynagar plain, laid down by the old river.Low river plain, and arsenic in some groundwater.Old fill over soft, water-bearing ground.Old riverside ground in the west, reclaimed salt marsh in the east.Riverbank mills and ghats in the west, slightly higher ground at Dum Dum.Salt Lake is reclaimed marsh, filled with river silt.New Town was built on farmland and water bodies.Flat delta land, just above flood level.Riverside delta land, with arsenic in some groundwater.Low, wet ground: Howrah is named after a marsh.The Hooghly rises every monsoon, so riverside plots need flood-aware plinth levels and drainage. The area guide has the details.

Open the GariaJadavpurTollygungeBehalaKasbaBallygungeLake GardensGarden ReachSonarpurBaruipurDiamond HarbourCentral KolkataNorth KolkataBaranagar & Dum DumSalt Lake & Lake TownNew Town & RajarhatMadhyamgram & BarasatSodepur to BarrackporeHowrahHooghly riverside guide →
KNOWLEDGE HUB · CALCULATORS

Read up before you design.

GUIDE · 13 MINWhy soil testing before design is non-negotiableGUIDE · 11 MINIsolated, raft or piles: which foundation your building needsGUIDE · 10 MINHow to read your structural drawings (GFC set)GUIDE · 11 MINColumn, beam, slab: how your building actually stands upGUIDE · 14 MINHow to read your sanctioned plan (FAR, setbacks, deviations)GUIDE · 11 MINWant to add a floor? Read this firstGUIDE · 11 MINCC vs OC: the two certificates that matterGUIDE · 11 MINM20 vs M25: what a concrete grade meansGUIDE · 10 MINStaircase rules: riser, tread and headroom the code requiresGUIDE · 9 MINRainwater harvesting & site drainage: designing for Kolkata rainGUIDE · 8 MINBasement & stilt parking: what going down really costsGUIDE · 9 MINWhen Vaastu and structural safety collide: who wins
1 of 12
1–2 of 6

OFTEN PAIRED WITH

ASK DELTA · ENGLISH · বাংলা · हिंदी

Ask Delta anything.

Soil tests, foundations, structural drawings, sanction plans and adding a floor, answered from our published guides.

Questions about engineering with us

In Kolkata, KMC asks for a soil investigation report from a geotechnical engineer for buildings over 10 m (rule 57(a) of the KMC Building Rules 2009). Below that it is not required, but we still advise one: the foundation is designed from the soil’s bearing capacity and water table, and Kolkata’s soft, wet alluvial ground is exactly where guesses go wrong. The test costs a small fraction of the building.

Source:KMC Building Rules 2009, rule 57(a)Our guide “Why soil testing before design is non-negotiable”Checked 9 Oct 2026

Under rule 47 of the KMC Building Rules 2009, a building up to 10 m with no deep foundation can be planned and supervised by a licensed building surveyor. Over 10 m and up to 15.5 m, or with piles or a basement, a licensed building surveyor or architect works with a structural engineer. Above 15.5 m, an architect, a structural engineer, a geotechnical engineer and a structural reviewer sign. Outside KMC, your municipality’s or authority’s own rules apply; the area guides name who approves.

Source:KMC Building Rules 2009, rule 47Checked 9 Oct 2026

It follows two numbers: how heavy the building is and how much load the soil can safely carry. Isolated footings suit firm soil and low buildings, a raft spreads the load on weaker soil, and piles reach firm ground far below, which is common in much of Kolkata. The soil report and the structural design decide; copying the neighbour’s foundation is a risky shortcut. Soil Bearing in our Lab shows how it works for typical grounds.

Source:Our guide “Isolated, raft or piles”Soil BearingChecked 13 Oct 2026

Two checks, in this order. First an engineer’s: can the foundation and columns carry the extra load as they are, with strengthening, or not at all? Then the rules’: does the plot have unused FAR, and is a revised sanction approved before work starts? Lighter walls and roofing can reduce the load on the old structure.

Source:Our guide “Want to add a floor? Read this first”Checked 13 Oct 2026

GFC means Good For Construction: the final, signed and numbered set the site must build from. It covers the architectural drawings and the structural ones (foundation, column, beam and slab details with bar sizes and spacing), each with a revision number and date. Your job is to confirm the site is building this set, at this revision, and nothing else.

Source:Our guide “How to read your structural drawings”Checked 13 Oct 2026

Yes. A peer review is one of our services: an independent engineer reads your drawings, checks the loads, member sizes and detailing against the codes and lists what should be corrected, before anything is built from them.

Source:Delta StructuresChecked 13 Oct 2026

The consultation and the preliminary estimate are free, usually within 48 hours*. An in-depth assessment and site visit is ₹2,499 across Kolkata (₹4,999 for the outskirts, on request), adjusted against the contract if you go ahead with us. A detailed BOQ is priced on request.

Source:Delta StructuresChecked 25 Nov 2026

WE’RE NEW · HERE IS HOW YOU CAN CHECK US

Start with a free preliminary estimate.

Tell us the plot, the road in front and what you want to build. The consultation and the preliminary estimate are free, usually within 48 hours*. An in-depth assessment and site visit is ₹2,499 (₹4,999 for the outskirts), adjusted against the contract if you go ahead with us.

Your requestA few lines. An engineer reads it.
What would you like?
Prefer the full estimate form, step by step? →

WhatsApp opens with your request ready. Nothing is sent until you press send there.Send by email

Monday to Saturday, 10am to 7pm IST.Free preliminary estimate, usually within 48 hours.*

Search or ask Delta