Skip to content
Delta Structures
EstimateFree estimate
03 · MATERIALS & LOGISTICS

Cement, steel, sand, pipes, wiring, tiles and fittings, specified to the right grade, ordered in the right quantity and checked at delivery. We also build, so we know which material failures hurt later, and we check like a builder, not a trader.

*Indicative, not guaranteed. Timing varies with the complexity of your query.

22 SERVICES
General Procurement & Supply
  • 01Cement, Steel, Sand & Aggregate Supply
  • 02Sanitaryware & Bathroom Fittings Sourcing
  • 03Electrical Fixtures & Wiring Material Supply
  • 04Paints, Putty & Finishing Materials
  • 05Doors, Windows & Hardware Supply
  • +17 more inside
See all 22
HOW A MATERIAL REACHES YOUR SITE
  1. Take off the quantities
  2. Specify each material
  3. Compare like for like
  4. Time the deliveries
  5. Check at the gate
  6. Store and reconcile
WHAT HAPPENS NEXT
  1. You tell us the jobA form, a WhatsApp message or a call.
  2. An engineer reviews itA free preliminary estimate, usually within 48 hours.*
  3. We visit and planA site visit (₹2,499, adjusted against the contract), then one plan and one contract.
HOW WE PRICE IT Materials bought the way your job is contracted.
  • Item-rateUsual for supply
  • Turnkey (lump sum)When we build it
  • Cost-plusFor open-book buying
CHECK IT YOURSELF Pick it, then work out what to order. Paver catalogueWhich paver suits your drive, path or garden?35 PRODUCTSMaterial ListHow much tile and paint does each room need?3 MINSteel Weight and BBSHow much steel, cut to what length?3 MIN
PRICING · NO SURPRISES

Our fees, before you ask.

Most jobs start free. Steps 2 and 3 are optional: take them when an engineer should see the site, or when you want every line priced.

  • No obligation
  • Each fee shown before you take the step
  • Fees come off your bill if you build with us
START HERE Usually 48 hours*

Free preliminary estimate

Best for: cement, steel and sand, tiles, sanitaryware and fittings.

Free
No obligation
YOU GETAn outline of the work and a rough cost range for the services you picked.
  • An engineer reads your request
  • From your form, photos or drawings
  • No site visit needed

Nothing in this step costs you anything.

OPTIONAL One visit

In-depth assessment and site visit

Best for: checking a delivery.

₹2,499/ visit
Across Kolkata · ₹4,999 for the outskirts, on request
YOU GETA written site assessment.
  • An engineer visits your site
  • An in-depth assessment of the site
  • Across Kolkata; the outskirts on request

Adjusted against the contract if you go ahead with us.

OPTIONAL A few business days

Detailed QTO & BOQ

Best for: the full list of what to buy.

On request
Quoted in writing before we start
YOU GETA line-by-line list of quantities and costs on our letterhead.
  • Every quantity counted from your drawings (QTO)
  • Every line priced (BOQ)
  • What banks accept for loans
  • Compare contractors item by item

Credited against your project bill if you build with us.

1 OF 3 · SWIPE

*Indicative, not guaranteed. Timing varies with the complexity of your query.The outskirts are the five areas we take on request.

FEES, PLAINLY

Questions about our fees

Because it needs no site visit. An engineer works from your form, photos and drawings, and sends an outline of the work and a rough cost range, usually within 48 hours.*

WHAT’S INCLUDED · 22 NAMED SERVICES

Every material specified, counted and checked.

Each service is named in your quote, so you can see exactly what is in it. Tap one to see what happens on site.

1–4 of 22
Cement, Steel, Sand & Aggregate SupplyDetailsTMT Bar Supply: Fe500 / Fe550DDetailsReady-Mix Concrete CoordinationDetailsShuttering Material & Equipment RentalDetailsBricks, AAC & Fly Ash Block SupplyDetailsPlumbing & Sanitary Pipe SupplyDetailsElectrical Fixtures & Wiring Material SupplyDetailsSanitaryware & Bathroom Fittings SourcingDetailsPumps, Tanks & Water Treatment EquipmentDetailsTiles, Marble & Granite SourcingDetailsPaints, Putty & Finishing MaterialsDetailsDoors, Windows & Hardware SupplyDetailsGlass, Aluminium & uPVC SectionsDetailsModular Kitchen & Furniture HardwareDetailsPlywood, Boards & Laminates SupplyDetailsPaver Blocks, Tiles & Kerbstones SupplyDetailsWaterproofing Chemicals & AdmixturesDetailsMaterial Testing Lab CoordinationDetailsVendor Rate Negotiation on Client's BehalfDetailsBulk Material Logistics & Delivery SchedulingDetailsSite Storage & Inventory ManagementDetailsSafety Gear & Site ConsumablesDetails
GROUP 01 / 05 · 5 SERVICESGROUP 02 / 05 · 4 SERVICESGROUP 03 / 05 · 7 SERVICESGROUP 04 / 05 · 2 SERVICESGROUP 05 / 05 · 4 SERVICES
Drag the orbit sideways, tap a group, or use ← →Swipe the orbit sideways, or tap a group
GROUP 01 / 05 · 5 SERVICES

Cement, steel and concrete

  • We check the structural staples for freshness, grade and cleanliness before they reach your mixer.

    ON SITECement checked for its manufacturing date and lumps, sand with the silt jar, aggregate for size and dust, before the load is signed for.

    How to check cement freshness at delivery →
  • We supply primary-producer steel with test certificates, not rerolled lookalikes.

    ON SITEFe500D or Fe550D as the structural drawing names, the brand and grade rolled into the bar matching the invoice, and a sample weighed.

    TMT steel: Fe500 vs Fe550D →
  • We order ready-mix concrete to grade, schedule it to the pour and check the slump at the gate.

    ON SITEThe grade ordered in writing and the pour booked with the plant; each truck’s delivery ticket and slump checked at the gate, and cubes cast for the lab.

    M20 vs M25: what a concrete grade means →
  • We hire out plates, props and mixers, and take them back when the slab is done.

    ON SITEPlates, props and a mixer hired for the pour, checked for straightness and holes before use and sent back once the props come out.

    Shuttering checks before a pour →
  • We supply bricks and blocks checked by sample for size and water absorption, delivered as the walls rise.

    ON SITEThe brick or block is chosen for the wall (load-bearing, partition, outside); a sample of each lot is checked for size, soundness and water absorption at the gate, and deliveries are timed to the masonry, stacked off the ground and covered.

GROUP 02 / 05 · 4 SERVICES

Pipes, wiring and fittings

  • We supply CPVC, UPVC and SWR systems with matched fittings from one brand.

    ON SITEUPVC or PPR for cold water, CPVC or PPR for hot, SWR for waste, fittings from the same system and the class printed on every length.

    UPVC, CPVC, PPR or GI: which pipe goes where →
  • We supply ISI-marked wiring and fixtures sized for today's loads.

    ON SITEISI-marked copper wire sized to each circuit, with the size and grade printed on the insulation, and MCBs and a 30 mA RCCB matched to it.

    House wiring: copper gauge and MCB sizing →
  • We source brand-matched fittings at rates we have negotiated.

    ON SITEWCs, basins and CP fittings from one brand range, opened and checked against the order (model, finish, every part) before the plumber starts.

    Bathroom fittings: CP, ceramic and the quality tells →
  • We supply pumps, plastic tanks, pressure systems and filters sized to your building’s daily water use.

    ON SITEThe daily use, the lift to the tank and the supply (corporation, sump or borewell) are worked out first; the pump, tanks, pressure system and filters are sized to them, and they come with their warranty papers and are checked before they are fitted.

GROUP 03 / 05 · 7 SERVICES

Tiles, paint, doors and glass

  • We buy batch-matched lots, so your floor doesn't change shade mid-room.

    ON SITETiles from one batch, with the same shade and size codes on every box, and spare boxes from that batch kept for later repairs.

    Count the tile boxes and paint: Material List →
  • We pick the right primer, putty and paint for each surface.

    ON SITEPrimer, putty and paint as one system for each surface, inside or out, bought to the area with the coverage the makers publish.

    Distemper, emulsion or enamel →
  • We supply frames, shutters and hardware that survive Kolkata's humidity.

    ON SITEFrames, shutters and hardware chosen for Kolkata’s damp (treated wood, uPVC or aluminium), checked for warp, finish and every fitting at delivery.

  • We source window and facade systems together with their hardware and gaskets.

    ON SITEToughened glass with its etched stamp, laminated glass overhead or where it guards a drop, and sections delivered with their hardware and gaskets.

    Toughened, laminated or DGU glass →
  • We supply hinges, channels and lifts graded for daily use, not generic ones.

    ON SITEHinges, channels and lift-ups chosen for the shutter’s weight and daily use, checked for soft-close and finish before the carpenter fixes them.

    Wardrobe and cabinet hardware →
  • We supply ply, MDF, HDHMR and laminates graded for where they go, wet, warm or dry, with the grade marks checked on arrival.

    ON SITEThe board is matched to each spot (MR, BWR or BWP ply, MDF or HDHMR, the laminate and edge band); the grade marks, thickness and edges are checked when the sheets arrive, and they are stored flat and dry until they are cut.

  • We supply pavers, outdoor tiles and kerbs from our catalogue, batch-matched and delivered to the count.

    ON SITEYou pick from our paver catalogue; the quantity is worked out with cuts and spares, one batch is ordered so the colour matches, and the pallets are counted and checked for cracks and chipped edges when they arrive.

GROUP 04 / 05 · 2 SERVICES

Waterproofing and testing

  • We supply membranes, coatings and plasticisers: the right product for each surface.

    ON SITEThe membrane or coating matched to the surface (roof, bathroom, basement or wall), and admixtures only where the mix design calls for them.

    Which waterproofing system does my surface need? →
  • We book the cube, sieve and silt tests, track them and send you the reports.

    ON SITECube, sieve and silt tests booked with a lab, the samples labelled, and each report filed against its pour or delivery.

    The 10-minute silt test for sand →
GROUP 05 / 05 · 4 SERVICES

Buying, delivery and storage

  • We negotiate as a bulk buyer, so you pay closer to trade rates.

    ON SITEQuotes compared on the same grade, brand and quantity, with delivery and unloading included, so the cheapest line is the cheapest in fact.

    Reading a BOQ and rate analysis →
  • We time each delivery to when the site needs it, not weeks early and in the way.

    ON SITEA delivery plan tied to the schedule, with access and unloading fixed in advance, so trucks arrive when the work is ready for them.

    Building through the monsoon →
  • We store materials covered and raised, use them first in, first out, and record wastage in writing.

    ON SITECement on raised planks, away from walls and covered; steel off the ground; a stock register reconciled against the measured work every month.

    Material reconciliation →
  • We keep the site stocked with helmets, gloves, binding wire and the other small items it cannot run out of.

    ON SITEHelmets, shoes, gloves, binding wire, cover blocks and curing sheets kept in stock, so a small missing item never holds up a pour.

    Site safety basics an owner should insist on →
Samples of stone, terracotta, timber, fabric and metal laid out on a table.
Materials chosen and sourced to the drawings.
STAGE BY STAGE · 6 STAGES

How a material reaches your site.

Skip the stages →
  1. Stage 01: Take off the quantities

    From the drawings and the BOQ: cement, steel, sand, bricks, tiles and paint, each with an honest allowance for wastage.

  2. Stage 02: Specify each material

    Grade, standard and size in writing: OPC or PPC, Fe500D or Fe550D, concrete or plaster sand, one tile batch.

  3. Stage 03: Compare like for like

    Rates compared on the same grade, brand and quantity, so a lower rate never hides a lower specification.

  4. Stage 04: Time the deliveries

    Each load arrives for the stage that needs it, so cement does not wait through the rains and stacks never block the work.

  5. Stage 05: Check at the gate

    Bag dates, the grade rolled into each bar, the silt jar, the brick ring test, tile batch codes: checked before the load is signed for.

  6. Stage 06: Store and reconcile

    Raised, covered and used first in, first out; what came in is set against what the measured work used, every month.

1 of 6
  1. Stage 01: Take off the quantities

    From the drawings and the BOQ: cement, steel, sand, bricks, tiles and paint, each with an honest allowance for wastage.

  2. Stage 02: Specify each material

    Grade, standard and size in writing: OPC or PPC, Fe500D or Fe550D, concrete or plaster sand, one tile batch.

  3. Stage 03: Compare like for like

    Rates compared on the same grade, brand and quantity, so a lower rate never hides a lower specification.

  4. Stage 04: Time the deliveries

    Each load arrives for the stage that needs it, so cement does not wait through the rains and stacks never block the work.

  5. Stage 05: Check at the gate

    Bag dates, the grade rolled into each bar, the silt jar, the brick ring test, tile batch codes: checked before the load is signed for.

  6. Stage 06: Store and reconcile

    Raised, covered and used first in, first out; what came in is set against what the measured work used, every month.

  1. Stage 01: Take off the quantities

    From the drawings and the BOQ: cement, steel, sand, bricks, tiles and paint, each with an honest allowance for wastage.

  2. Stage 02: Specify each material

    Grade, standard and size in writing: OPC or PPC, Fe500D or Fe550D, concrete or plaster sand, one tile batch.

  3. Stage 03: Compare like for like

    Rates compared on the same grade, brand and quantity, so a lower rate never hides a lower specification.

  4. Stage 04: Time the deliveries

    Each load arrives for the stage that needs it, so cement does not wait through the rains and stacks never block the work.

  5. Stage 05: Check at the gate

    Bag dates, the grade rolled into each bar, the silt jar, the brick ring test, tile batch codes: checked before the load is signed for.

  6. Stage 06: Store and reconcile

    Raised, covered and used first in, first out; what came in is set against what the measured work used, every month.

OUR PAVER CATALOGUE · FREE TOOLS

Pick it, then work out what to order.

Browse our paver blocks, pattern tiles and kerbstones by colour and keep the ones you like. Then count tile boxes and paint for each room, steel by bar size and cut length, bricks or blocks with their cement and sand. Each takes a few minutes, wastage included, and the list is yours to keep or send to us.

1 of 4
HOW YOU CAN CONTRACT WITH US

Materials bought the way your job is contracted.

When we build the job, the materials come inside the building contract, to the grades written in it. When you need materials only, we price each item as it is delivered. When you want to see every bill, we buy at cost, show you the invoices and take an agreed fee.

1 of 3
PAY FOR WHAT’S MEASUREDUsual for supply

Item-rate

You pay agreed rates for measured quantities: per square metre of tiling or plaster, per point of wiring, per running metre of pipe.

Price certainty
Flexibility
Transparency

Suits: Supply-only orders priced per bag, tonne, box or length, for the quantity delivered and checked.

Watch: The final cost follows the final quantities, so measurements must be recorded and agreed.

ONE AGREED PRICEWhen we build it

Turnkey (lump sum)

One fixed price for a defined scope, worked out from complete drawings and specifications.

Price certainty
Flexibility
Transparency

Suits: When we build the whole job, the materials sit inside the one agreed price, to the grades in the contract.

Watch: Changes after signing become variations, so lock your decisions early.

OPEN BOOKFor open-book buying

Cost-plus

You pay the actual cost of materials and labour, with the bills shared, plus an agreed fee.

Price certainty
Flexibility
Transparency

Suits: You pay the materials at cost, with every invoice shown, plus an agreed fee.

Watch: The total isn’t fixed, so it works best with clear records and regular reviews.

PAY FOR WHAT’S MEASUREDUsual for supply

Item-rate

You pay agreed rates for measured quantities: per square metre of tiling or plaster, per point of wiring, per running metre of pipe.

Price certainty
Flexibility
Transparency

Suits: Supply-only orders priced per bag, tonne, box or length, for the quantity delivered and checked.

Watch: The final cost follows the final quantities, so measurements must be recorded and agreed.

ONE AGREED PRICEWhen we build it

Turnkey (lump sum)

One fixed price for a defined scope, worked out from complete drawings and specifications.

Price certainty
Flexibility
Transparency

Suits: When we build the whole job, the materials sit inside the one agreed price, to the grades in the contract.

Watch: Changes after signing become variations, so lock your decisions early.

OPEN BOOKFor open-book buying

Cost-plus

You pay the actual cost of materials and labour, with the bills shared, plus an agreed fee.

Price certainty
Flexibility
Transparency

Suits: You pay the materials at cost, with every invoice shown, plus an agreed fee.

Watch: The total isn’t fixed, so it works best with clear records and regular reviews.

WORKING NEAR YOU · 20 AREA GUIDES

Every locality has its own rules and ground.

Pick your area to see who approves your plan and what the ground is like. Both change the order list: soft or wet ground can mean piles or a raft, more steel and concrete, and deliveries planned around the rains.

Garia, Patuli, Mukundapur & AjoynagarJadavpur, Baghajatin & SantoshpurTollygunge, Regent Park, Bansdroni, Naktala & HaridevpurBehala, Thakurpukur & JokaKasba, EM Bypass, Kalikapur, Anandapur, Picnic Garden & TiljalaBallygunge, Alipore, Bhowanipore & KalighatLake Gardens, Golf Green, Dhakuria & SelimpurGarden Reach, Maheshtala & Budge BudgeSonarpur, Narendrapur, Harinavi, Subhashgram, Mallickpur & ChampahatiRajpur, Baruipur & KamalgaziBishnupur, Amtala & Diamond HarbourCentral Kolkata: Park Street, Esplanade, Sealdah, Entally & BeliaghataNorth Kolkata: Shyambazar, Bagbazar, Shobhabazar, Maniktala, Ultadanga, Phoolbagan & KankurgachiBaranagar, Sinthi, Belgharia, Dum Dum, Nagerbazar & BiratiSalt Lake, Lake Town & Bangur AvenueNew Town, Rajarhat, Kestopur, Baguiati, Teghoria, Kaikhali & Chinar ParkMadhyamgram & BarasatSodepur, Agarpara, Khardah, Titagarh & BarrackporeHowrah, Shibpur, Santragachi, Liluah, Bally, Andul, Domjur & UluberiaHooghly: Dankuni, Uttarpara, Serampore & Chandannagar

WHO APPROVES YOUR PLANGaria is split between Kolkata Municipal Corporation and Rajpur Sonarpur Municipality.The cluster is within Kolkata Municipal Corporation, split across Boroughs X, XI and XII.The cluster is within Kolkata Municipal Corporation, across Boroughs X, XI and XIII.Behala is within Kolkata Municipal Corporation, across Boroughs XIII, XIV and XVI.The cluster is within Kolkata Municipal Corporation, across four boroughs.The cluster is within Kolkata Municipal Corporation, across Boroughs VIII, IX and X.Every ward in the cluster is in Kolkata Municipal Corporation’s Borough X.Three civic bodies share the cluster.Most of the cluster is in Rajpur Sonarpur Municipality, one of the state’s oldest.Two municipalities and the gram panchayats around them.One municipality, then gram panchayats.All of it is Kolkata Municipal Corporation, across four boroughs.All of it is Kolkata Municipal Corporation, across three boroughs.Six civic bodies: one corporation and five municipalities.Three bodies: the corporation, the IT township authority and a municipality.NKDA inside New Town, the municipal corporation along VIP Road.Two municipalities, then gram panchayats.Four municipalities and a cantonment board.A corporation, two municipalities, then gram panchayats.A corporation and six municipalities.

THE GROUNDMuch of Patuli is urbanised wetland on clayey, alluvial soil.Santoshpur was shallow marsh and farmland until the 1970s.Much of the cluster was forest, swamp and ponds not long ago.Behala was once part of the Sundarbans, and parts of it are filled marsh.Much of the Bypass side was wetland until the 1980s.The lake was dug out of marsh, and Kalighat sits on the old river course.Low, flat land between a lake and a golf course, and heavy monsoon bursts.Low delta land on the east bank of the Hooghly.Flat delta land along the silted course of the Adi Ganga.The Baruipur–Jaynagar plain, laid down by the old river.Low river plain, and arsenic in some groundwater.Old fill over soft, water-bearing ground.Old riverside ground in the west, reclaimed salt marsh in the east.Riverbank mills and ghats in the west, slightly higher ground at Dum Dum.Salt Lake is reclaimed marsh, filled with river silt.New Town was built on farmland and water bodies.Flat delta land, just above flood level.Riverside delta land, with arsenic in some groundwater.Low, wet ground: Howrah is named after a marsh.The Hooghly rises every monsoon, so riverside plots need flood-aware plinth levels and drainage. The area guide has the details.

Open the GariaJadavpurTollygungeBehalaKasbaBallygungeLake GardensGarden ReachSonarpurBaruipurDiamond HarbourCentral KolkataNorth KolkataBaranagar & Dum DumSalt Lake & Lake TownNew Town & RajarhatMadhyamgram & BarasatSodepur to BarrackporeHowrahHooghly riverside guide →
KNOWLEDGE HUB · CALCULATORS

Read up before the trucks arrive.

GUIDE · 12 MINHow to check cement freshness at deliveryGUIDE · 12 MINTMT steel: Fe500 vs Fe550D, and bar checks at deliveryGUIDE · 12 MINThe 10-minute silt test for sandGUIDE · 10 MINM-sand vs river sand: the sand you can (and can’t) get nowGUIDE · 10 MINOPC 43, OPC 53 or PPC: which cement for which jobGUIDE · 10 MINStone aggregate: the checks nobody does (and should)GUIDE · 13 MIN5 on-site brick quality checksGUIDE · 10 MINAAC blocks vs red brick vs fly-ash brick: the wall material choiceGUIDE · 8 MINUPVC, CPVC, PPR or GI: which pipe goes whereGUIDE · 9 MINHouse wiring: copper gauge, MCB sizing and what ‘ISI’ must meanGUIDE · 8 MINToughened, laminated or DGU: choosing glass that fails safelyGUIDE · 11 MINMR vs BWR vs BWP plywood (IS 303 / IS 710)GUIDE · 11 MINDistemper vs emulsion vs enamel, and why primer mattersGUIDE · 8 MINMaterial reconciliation: how cement and steel stop disappearing
1 of 14
GUIDE · 12 MINHow to check cement freshness at deliveryGUIDE · 12 MINTMT steel: Fe500 vs Fe550D, and bar checks at deliveryGUIDE · 12 MINThe 10-minute silt test for sandGUIDE · 10 MINM-sand vs river sand: the sand you can (and can’t) get nowGUIDE · 10 MINOPC 43, OPC 53 or PPC: which cement for which jobGUIDE · 10 MINStone aggregate: the checks nobody does (and should)GUIDE · 13 MIN5 on-site brick quality checksGUIDE · 10 MINAAC blocks vs red brick vs fly-ash brick: the wall material choiceGUIDE · 8 MINUPVC, CPVC, PPR or GI: which pipe goes whereGUIDE · 9 MINHouse wiring: copper gauge, MCB sizing and what ‘ISI’ must meanGUIDE · 8 MINToughened, laminated or DGU: choosing glass that fails safelyGUIDE · 11 MINMR vs BWR vs BWP plywood (IS 303 / IS 710)GUIDE · 11 MINDistemper vs emulsion vs enamel, and why primer mattersGUIDE · 8 MINMaterial reconciliation: how cement and steel stop disappearing
1–2 of 6

OFTEN PAIRED WITH

ASK DELTA · ENGLISH · বাংলা · हिंदी

Ask Delta anything.

Cement, steel, sand, bricks, pipes, wiring and glass: what to order and what to check at delivery, answered from our published guides.

Questions about materials and supply

Every load, against the order: the manufacturing date and any lumps on cement bags, the brand and grade rolled into TMT bars, a silt jar test on sand, size and dust on aggregate, the ring and drop tests on bricks, and the batch code on tile boxes. A load that fails goes back on the truck, before anyone signs for it.

Source:Our guide “How to check cement freshness at delivery”Our guide “The 10-minute silt test for sand”Our guide “5 on-site brick quality checks”Checked 13 Oct 2026

Find the ISI mark and the licence number printed with it, on the bag or the bundle tag, and enter the number in the Bureau of Indian Standards’ free BIS Care app (Verify Licence Details): it shows the maker and whether the licence is current. On TMT bars the brand and grade are also rolled into the bar itself; they should match the invoice and the structural drawing.

Source:Bureau of Indian Standards, BIS Care appOur guide “TMT steel: Fe500 vs Fe550D”Checked 13 Oct 2026

The one your structural drawing names. The number is the bar’s yield strength in MPa; the D means it stretches further before it breaks, which matters in Kolkata’s Seismic Zone III. A stronger bar is not a free upgrade: the design decides the grade, and each delivery is checked against the drawing, not just the invoice.

Source:Our guide “TMT steel: Fe500 vs Fe550D”Our guide “Earthquake zones and what Zone III means for Kolkata”Checked 13 Oct 2026

Usually M-sand now: river-sand mining is heavily restricted, and well-graded manufactured sand is clean and consistent. Ask for M-sand graded to IS 383, concrete grade for concrete and plaster grade for plaster, and refuse plain crusher dust sold as M-sand. Any sand gets the silt jar test: a settled layer of more than about 8% means wash it or send it back. Never use sea sand for structural work.

Source:Our guide “M-sand vs river sand”Our guide “The 10-minute silt test for sand”Checked 13 Oct 2026

Whichever the engineer specifies for each part of the job. OPC 53 gains strength fast and runs hot, so it suits structural concrete that is cured with discipline; PPC gains strength more slowly but ends up more durable, and suits plaster, masonry and Kolkata’s wet climate. Freshness matters more than grade: use cement within about three months of the date on the bag.

Source:Our guide “OPC 43, OPC 53 or PPC”Our guide “How to check cement freshness at delivery”Checked 13 Oct 2026

Order from the drawings and the measured quantities, not a rule of thumb. Our Lab tools count tile boxes and paint room by room, steel by bar size and cut length, and bricks or blocks with their mortar, wastage included. On site, honest wastage is about 2 to 3% for cement, 3 to 5% for steel and 4 to 5% for bricks; more than that has a cause, and a monthly reconciliation finds it.

Source:Our guide “Material reconciliation”Material ListSteel Weight and BBSChecked 13 Oct 2026

The consultation and the preliminary estimate are free, usually within 48 hours*. An in-depth assessment and site visit is ₹2,499 across Kolkata (₹4,999 for the outskirts, on request), adjusted against the contract if you go ahead with us. A detailed BOQ is priced on request.

Source:Delta StructuresChecked 25 Nov 2026

WE’RE NEW · HERE IS HOW YOU CAN CHECK US

Start with a free preliminary estimate.

Send us your drawings, a BOQ or a list of what you need. The consultation and the preliminary estimate are free, usually within 48 hours*. An in-depth assessment and site visit is ₹2,499 (₹4,999 for the outskirts), adjusted against the contract if you go ahead with us.

Your requestA few lines. An engineer reads it.
What would you like?
Prefer the full estimate form, step by step? →

WhatsApp opens with your request ready. Nothing is sent until you press send there.Send by email

Monday to Saturday, 10am to 7pm IST.Free preliminary estimate, usually within 48 hours.*

Search or ask Delta