06 · CONTROL & VISIBILITY

Schedules, budgets, trades, quality checks and progress reports, run by one accountable firm. Every running bill is checked against the work on site, and every stage is inspected before the next one covers it.

*Indicative, not guaranteed. Timing varies with the complexity of your query.

20 SERVICES
Project Management
  • 01Detailed Scheduling & Milestone Planning
  • 02Budget Planning & Cost Control
  • 03Vendor & Subcontractor Coordination
  • 04Site Quality Control & Inspections
  • 05Risk Assessment & Mitigation Planning
  • +15 more inside
See all 20
HOW A PROJECT IS RUN
  1. Set the baseline
  2. Line up the trades
  3. Inspect before it is covered
  4. Measure and certify
  5. Report every week
  6. Snag and hand over
WHAT HAPPENS NEXT
  1. You tell us the jobA form, a WhatsApp message or a call.
  2. An engineer reviews itA free preliminary estimate, usually within 48 hours.*
  3. We visit and planA site visit (₹2,499, adjusted against the contract), then one plan and one contract.
HOW WE PRICE IT One accountable firm, however you contract.
  • Item-rateFor single checks
  • Turnkey (lump sum)Usual when we build it
  • Cost-plusWhen you keep the trades
CHECK IT YOURSELF Plan the season, check every stage. Season PlannerStart in the right month, finish sooner.2 MINSite ReadinessCheck before it gets buried.3 MINCost-per-Sq-Ft BenchmarkerIs your contractor’s quote fair?3 MIN
PRICING · NO SURPRISES

Our fees, before you ask.

Most jobs start free. Steps 2 and 3 are optional: take them when an engineer should see the site, or when you want every line priced.

  • No obligation
  • Each fee shown before you take the step
  • Fees come off your bill if you build with us
START HERE Usually 48 hours*

Free preliminary estimate

Best for: building while you live far away, bills to check before you pay.

Free
No obligation
YOU GETAn outline of the work and a rough cost range for the services you picked.
  • An engineer reads your request
  • From your form, photos or drawings
  • No site visit needed

Nothing in this step costs you anything.

OPTIONAL One visit

In-depth assessment and site visit

Best for: a site that has slowed down, quality checks on your site.

₹2,499/ visit
Across Kolkata · ₹4,999 for the outskirts, on request
YOU GETA written site assessment.
  • An engineer visits your site
  • An in-depth assessment of the site
  • Across Kolkata; the outskirts on request

Adjusted against the contract if you go ahead with us.

OPTIONAL A few business days

Detailed QTO & BOQ

Best for: a bank loan, or comparing contractors item by item.

On request
Quoted in writing before we start
YOU GETA line-by-line list of quantities and costs on our letterhead.
  • Every quantity counted from your drawings (QTO)
  • Every line priced (BOQ)
  • What banks accept for loans
  • Compare contractors item by item

Credited against your project bill if you build with us.

1 OF 3 · SWIPE

*Indicative, not guaranteed. Timing varies with the complexity of your query.The outskirts are the five areas we take on request.

FEES, PLAINLY

Questions about our fees

Because it needs no site visit. An engineer works from your form, photos and drawings, and sends an outline of the work and a rough cost range, usually within 48 hours.*

WHAT’S INCLUDED · 20 NAMED SERVICES

One plan, one ledger and one firm answerable for the site.

Each service is named in your quote, so you can see exactly what is in it. Tap one to see what happens on site.

1–4 of 20
Detailed Scheduling & Milestone PlanningDetailsRisk Assessment & Mitigation PlanningDetailsDelay Analysis & Recovery PlanningDetailsBudget Planning & Cost ControlDetailsContract & BOQ AdministrationDetailsBill Certification & Payment RecommendationsDetailsBank & Lender Progress CertificationDetailsSite Quality Control & InspectionsDetailsSafety Management & Site AuditsDetailsThird-Party Quality AuditsDetailsSnag Lists & Defects ManagementDetailsHandover Documentation & As-Built RecordsDetailsVendor & Subcontractor CoordinationDetailsMulti-Contractor IntegrationDetailsMaterial Reconciliation & Wastage ControlDetailsLabour Management & Productivity TrackingDetailsProgress Documentation & ReportingDetailsClient Progress Dashboards & Milestone UpdatesDetailsOwner's Engineer / Client RepresentationDetailsNRI & Remote Owner BuildsDetails
GROUP 01 / 05 · 3 SERVICESGROUP 02 / 05 · 4 SERVICESGROUP 03 / 05 · 5 SERVICESGROUP 04 / 05 · 4 SERVICESGROUP 05 / 05 · 4 SERVICES
Drag the orbit sideways, tap a group, or use ← →Swipe the orbit sideways, or tap a group
GROUP 01 / 05 · 3 SERVICES

Plan and schedule

  • We give you a dated plan with a critical path, so 'on track' means something.

    ON SITEEvery task dated and linked to the ones it depends on, with the critical path marked, so “on track” is measured against a baseline, not a feeling.

    Reading a schedule: baseline, critical path, float →
  • We name what can go wrong early (monsoon, supply, labour) and plan a fallback for each.

    ON SITEThe risks named early (the monsoon, supply, labour, neighbours, approvals), each with an owner and a plan B.

    Start in the right month: Season Planner →
  • We find out why it slipped and who owns the delay, and re-sequence the path back.

    ON SITEWhy it slipped, who owns each delay, and a re-sequenced plan back to a realistic handover date.

    Early warning signs of a stalling site →
GROUP 02 / 05 · 4 SERVICES

Money and contracts

  • We track what is committed against what is spent, and put every change order in writing.

    ON SITEA budget by stage, what is committed against what is spent, and every change written and priced as a change order before the work is done.

    Price escalation clauses →
  • We keep the agreements, measurements and certified bills accurate and up to date.

    ON SITEThe agreement, the BOQ and every measurement kept current, so each bill traces back to the work and the rate agreed.

    Reading a BOQ and rate analysis →
  • We check every running bill against the site, so you pay only for verified work.

    ON SITEEach running bill measured against the site before we recommend payment, with retention held as the contract says.

    Payment milestones that protect you →
  • We prepare stage certificates in the lender's format, so the money is released the first time.

    ON SITEStage certificates with the photos, measurements and cost statements lenders ask for, so a disbursement is not held up.

    Construction-linked loans →
GROUP 03 / 05 · 5 SERVICES

Quality and safety

  • We check each stage before the work gets covered up.

    ON SITEA checklist for each stage, run before the next stage covers the work, with photos and a signature for each check.

    Check before it gets buried: Site Readiness →
  • We run the checklist that protects workers and owners, from helmets to harnesses.

    ON SITEHelmets, footwear, scaffolding, guarded edges and excavations, and electric leads kept out of water, checked on every visit.

    Site safety basics an owner should insist on →
  • We inspect each stage independently on projects we don't build.

    ON SITEIndependent stage inspections on sites we don’t build, with photos and a written report for you and your contractor.

  • We list every defect in writing and see each one fixed before handover.

    ON SITEA room-by-room snag list, each item photographed, fixed, re-checked and signed off before the keys change hands.

    Retention money and the defect liability period →
  • At handover you get the as-built drawings, the test records, the warranties and the manuals in one file.

    ON SITEThrough the build, the test results, the pipe and wiring routes and the material certificates are kept; at handover they come to you as one file with the as-built drawings, the warranties, the fitting manuals and a list of what to maintain and when.

GROUP 04 / 05 · 4 SERVICES

Trades, labour and materials

  • We sequence all the trades under one head, so they don't block each other.

    ON SITEAll trades sequenced by one site head: the plumber before the plasterer, the electrician before the ceiling, deliveries timed to the work.

  • Already have contractors? We become the one point of accountability across them.

    ON SITEWhere you already have contractors, we set one schedule, run one site meeting and keep one ledger across all of them.

    Labour, item-rate or turnkey →
  • We match cement in against concrete out, so theft and wastage show up in the ledger.

    ON SITECement and steel received, less what the measured work should have used, checked every month, so theft and wastage show while they are small.

    Material reconciliation →
  • We keep crew sizes right and track their output, with no ghost muster rolls.

    ON SITECrew sizes planned to the schedule, attendance checked on site and output tracked against it, with no names on the muster roll that never come.

GROUP 05 / 05 · 4 SERVICES

Reports and representation

  • We send you dated photos and a report at every milestone.

    ON SITEDated photos and a short report at every milestone, from the daily progress record the site keeps.

    The daily progress report →
  • You follow the progress on your phone, milestone by milestone.

    ON SITEProgress, photos and the next decisions you need to make, shared on your phone every week.

  • Our engineers sit on your side of the table and check the work for you.

    ON SITEAn engineer on your side of the table: checking drawings, quality, bills and the schedule, and speaking for you at site meetings.

    What a good construction agreement must contain →
  • We run your build while you are away: video walkthroughs, dated photos and every bill checked against the site before you pay.

    ON SITEOne engineer is your contact for the whole build; you get a weekly report with dated photos, a video walkthrough at each milestone and every running bill checked against the work, and decisions come to you in writing, so nothing waits for your next visit.

A surveying instrument on a tripod on a construction site, with columns and steel behind.
Set out, measured and checked at every stage.
STAGE BY STAGE · 6 STAGES

How a project is run.

Skip the stages →
  1. Stage 01: Set the baseline

    Scope, BOQ, a dated schedule with its critical path and payment stages, agreed before work starts.

  2. Stage 02: Line up the trades

    Contractors, vendors and deliveries in the right order, so no trade waits on another.

  3. Stage 03: Inspect before it is covered

    Steel before concrete, conduits and pipes before plaster, waterproofing before tiles.

  4. Stage 04: Measure and certify

    Each running bill checked against measured work; cement and steel reconciled every month.

  5. Stage 05: Report every week

    Dated photos, progress against the baseline, the risks ahead and the decisions we need from you.

  6. Stage 06: Snag and hand over

    A snag list fixed and signed off, drawings and warranties on file, retention released after the defects period.

1 of 6
  1. Stage 01: Set the baseline

    Scope, BOQ, a dated schedule with its critical path and payment stages, agreed before work starts.

  2. Stage 02: Line up the trades

    Contractors, vendors and deliveries in the right order, so no trade waits on another.

  3. Stage 03: Inspect before it is covered

    Steel before concrete, conduits and pipes before plaster, waterproofing before tiles.

  4. Stage 04: Measure and certify

    Each running bill checked against measured work; cement and steel reconciled every month.

  5. Stage 05: Report every week

    Dated photos, progress against the baseline, the risks ahead and the decisions we need from you.

  6. Stage 06: Snag and hand over

    A snag list fixed and signed off, drawings and warranties on file, retention released after the defects period.

  1. Stage 01: Set the baseline

    Scope, BOQ, a dated schedule with its critical path and payment stages, agreed before work starts.

  2. Stage 02: Line up the trades

    Contractors, vendors and deliveries in the right order, so no trade waits on another.

  3. Stage 03: Inspect before it is covered

    Steel before concrete, conduits and pipes before plaster, waterproofing before tiles.

  4. Stage 04: Measure and certify

    Each running bill checked against measured work; cement and steel reconciled every month.

  5. Stage 05: Report every week

    Dated photos, progress against the baseline, the risks ahead and the decisions we need from you.

  6. Stage 06: Snag and hand over

    A snag list fixed and signed off, drawings and warranties on file, retention released after the defects period.

FREE CHECKS · FROM OUR LAB

Plan the season, check every stage.

Which month to start in, what to check before concrete, plaster or tiles cover the work, and whether a quote is fair. Each check takes a few minutes, and the result is yours to keep or send to us.

1 of 3
HOW YOU CAN CONTRACT WITH US

One accountable firm, however you contract.

When we build the job, project management comes inside the building contract. On a site where you already have contractors, we work on your side as owner’s engineer, checking bills, quality and the schedule for an agreed fee.

1 of 3
PAY FOR WHAT’S MEASUREDFor single checks

Item-rate

You pay agreed rates for measured quantities: per square metre of tiling or plaster, per point of wiring, per running metre of pipe.

Price certainty
Flexibility
Transparency

Suits: Third-party audits, bill checks or bank stage certificates, each priced per visit or stage.

Watch: The final cost follows the final quantities, so measurements must be recorded and agreed.

ONE AGREED PRICEUsual when we build it

Turnkey (lump sum)

One fixed price for a defined scope, worked out from complete drawings and specifications.

Price certainty
Flexibility
Transparency

Suits: When we build the whole job, project management sits inside the one agreed price.

Watch: Changes after signing become variations, so lock your decisions early.

OPEN BOOKWhen you keep the trades

Cost-plus

You pay the actual cost of materials and labour, with the bills shared, plus an agreed fee.

Price certainty
Flexibility
Transparency

Suits: You hire the contractors or buy the materials; we check every bill and take an agreed fee.

Watch: The total isn’t fixed, so it works best with clear records and regular reviews.

PAY FOR WHAT’S MEASUREDFor single checks

Item-rate

You pay agreed rates for measured quantities: per square metre of tiling or plaster, per point of wiring, per running metre of pipe.

Price certainty
Flexibility
Transparency

Suits: Third-party audits, bill checks or bank stage certificates, each priced per visit or stage.

Watch: The final cost follows the final quantities, so measurements must be recorded and agreed.

ONE AGREED PRICEUsual when we build it

Turnkey (lump sum)

One fixed price for a defined scope, worked out from complete drawings and specifications.

Price certainty
Flexibility
Transparency

Suits: When we build the whole job, project management sits inside the one agreed price.

Watch: Changes after signing become variations, so lock your decisions early.

OPEN BOOKWhen you keep the trades

Cost-plus

You pay the actual cost of materials and labour, with the bills shared, plus an agreed fee.

Price certainty
Flexibility
Transparency

Suits: You hire the contractors or buy the materials; we check every bill and take an agreed fee.

Watch: The total isn’t fixed, so it works best with clear records and regular reviews.

WORKING NEAR YOU · 20 AREA GUIDES

Every locality has its own rules and ground.

Pick your area to see who approves your plan and what the ground is like. Both shape the schedule: the sanction comes first, and soft or wet ground changes the order of work.

Garia, Patuli, Mukundapur & AjoynagarJadavpur, Baghajatin & SantoshpurTollygunge, Regent Park, Bansdroni, Naktala & HaridevpurBehala, Thakurpukur & JokaKasba, EM Bypass, Kalikapur, Anandapur, Picnic Garden & TiljalaBallygunge, Alipore, Bhowanipore & KalighatLake Gardens, Golf Green, Dhakuria & SelimpurGarden Reach, Maheshtala & Budge BudgeSonarpur, Narendrapur, Harinavi, Subhashgram, Mallickpur & ChampahatiRajpur, Baruipur & KamalgaziBishnupur, Amtala & Diamond HarbourCentral Kolkata: Park Street, Esplanade, Sealdah, Entally & BeliaghataNorth Kolkata: Shyambazar, Bagbazar, Shobhabazar, Maniktala, Ultadanga, Phoolbagan & KankurgachiBaranagar, Sinthi, Belgharia, Dum Dum, Nagerbazar & BiratiSalt Lake, Lake Town & Bangur AvenueNew Town, Rajarhat, Kestopur, Baguiati, Teghoria, Kaikhali & Chinar ParkMadhyamgram & BarasatSodepur, Agarpara, Khardah, Titagarh & BarrackporeHowrah, Shibpur, Santragachi, Liluah, Bally, Andul, Domjur & UluberiaHooghly: Dankuni, Uttarpara, Serampore & Chandannagar

WHO APPROVES YOUR PLANGaria is split between Kolkata Municipal Corporation and Rajpur Sonarpur Municipality.The cluster is within Kolkata Municipal Corporation, split across Boroughs X, XI and XII.The cluster is within Kolkata Municipal Corporation, across Boroughs X, XI and XIII.Behala is within Kolkata Municipal Corporation, across Boroughs XIII, XIV and XVI.The cluster is within Kolkata Municipal Corporation, across four boroughs.The cluster is within Kolkata Municipal Corporation, across Boroughs VIII, IX and X.Every ward in the cluster is in Kolkata Municipal Corporation’s Borough X.Three civic bodies share the cluster.Most of the cluster is in Rajpur Sonarpur Municipality, one of the state’s oldest.Two municipalities and the gram panchayats around them.One municipality, then gram panchayats.All of it is Kolkata Municipal Corporation, across four boroughs.All of it is Kolkata Municipal Corporation, across three boroughs.Six civic bodies: one corporation and five municipalities.Three bodies: the corporation, the IT township authority and a municipality.NKDA inside New Town, the municipal corporation along VIP Road.Two municipalities, then gram panchayats.Four municipalities and a cantonment board.A corporation, two municipalities, then gram panchayats.A corporation and six municipalities.

THE GROUNDMuch of Patuli is urbanised wetland on clayey, alluvial soil.Santoshpur was shallow marsh and farmland until the 1970s.Much of the cluster was forest, swamp and ponds not long ago.Behala was once part of the Sundarbans, and parts of it are filled marsh.Much of the Bypass side was wetland until the 1980s.The lake was dug out of marsh, and Kalighat sits on the old river course.Low, flat land between a lake and a golf course, and heavy monsoon bursts.Low delta land on the east bank of the Hooghly.Flat delta land along the silted course of the Adi Ganga.The Baruipur–Jaynagar plain, laid down by the old river.Low river plain, and arsenic in some groundwater.Old fill over soft, water-bearing ground.Old riverside ground in the west, reclaimed salt marsh in the east.Riverbank mills and ghats in the west, slightly higher ground at Dum Dum.Salt Lake is reclaimed marsh, filled with river silt.New Town was built on farmland and water bodies.Flat delta land, just above flood level.Riverside delta land, with arsenic in some groundwater.Low, wet ground: Howrah is named after a marsh.The Hooghly rises every monsoon, so riverside plots need flood-aware plinth levels and drainage. The area guide has the details.

Open the GariaJadavpurTollygungeBehalaKasbaBallygungeLake GardensGarden ReachSonarpurBaruipurDiamond HarbourCentral KolkataNorth KolkataBaranagar & Dum DumSalt Lake & Lake TownNew Town & RajarhatMadhyamgram & BarasatSodepur to BarrackporeHowrahHooghly riverside guide →
KNOWLEDGE HUB · CALCULATORS

Read up before the site starts.

GUIDE · 3 MINPayment milestones that protect youGUIDE · 4 MINWhat a good construction agreement must containGUIDE · 3 MINReading a schedule: baseline, critical path, floatGUIDE · 3 MINEarly warning signs of a stalling siteGUIDE · 4 MINReading a BOQ & rate analysis: where a quote hides its moneyGUIDE · 3 MINRetention money & the defect liability period: your post-handover leverageGUIDE · 3 MINThe daily progress report: what a well-run site writes down every dayGUIDE · 3 MINMaterial reconciliation: how cement and steel stop disappearingGUIDE · 3 MINPrice escalation clauses: when cement and steel prices jump mid-projectGUIDE · 4 MINLabour, item-rate or turnkey: how to structure your buildGUIDE · 3 MINSite safety basics an owner should insist onGUIDE · 3 MINNeighbours, party walls & digging next door: permissions before excavationGUIDE · 3 MINConstruction-linked loans: how disbursement actually worksGUIDE · 3 MINThe snag list: inspecting a flat before you accept possession
1 of 14
GUIDE · 3 MINPayment milestones that protect youGUIDE · 4 MINWhat a good construction agreement must containGUIDE · 3 MINReading a schedule: baseline, critical path, floatGUIDE · 3 MINEarly warning signs of a stalling siteGUIDE · 4 MINReading a BOQ & rate analysis: where a quote hides its moneyGUIDE · 3 MINRetention money & the defect liability period: your post-handover leverageGUIDE · 3 MINThe daily progress report: what a well-run site writes down every dayGUIDE · 3 MINMaterial reconciliation: how cement and steel stop disappearingGUIDE · 3 MINPrice escalation clauses: when cement and steel prices jump mid-projectGUIDE · 4 MINLabour, item-rate or turnkey: how to structure your buildGUIDE · 3 MINSite safety basics an owner should insist onGUIDE · 3 MINNeighbours, party walls & digging next door: permissions before excavationGUIDE · 3 MINConstruction-linked loans: how disbursement actually worksGUIDE · 3 MINThe snag list: inspecting a flat before you accept possession
1–2 of 6

OFTEN PAIRED WITH

ASK DELTA · ENGLISH · বাংলা · हिंदी

Ask Delta anything.

Payment stages, contracts, schedules, BOQs and stalled sites, answered from our published guides.

Questions about managing a project with us

Against finished stages you can check, never large sums up front. A healthy shape is a modest advance (about 10%), then payments at the plinth, each slab, brickwork, plaster and finishes, with 5 to 10% held back as retention until after handover. Every payment follows an inspection, and every change of scope is a written, priced change order.

Source:Our guide “Payment milestones that protect you”Checked 13 Oct 2026

Seven things, in writing: the exact scope with a BOQ, a payment schedule tied to stages, a dated timeline with a delay clause, named brands and grades, a written change-order process, a defects-liability period, and how disputes are settled. A one-page estimate with a signature is not an agreement.

Source:Our guide “What a good construction agreement must contain”Checked 13 Oct 2026

Ask what is on the critical path this month: the chain of tasks where any delay moves the handover. Sites rarely stop suddenly; they fade. Watch for fewer workers, thinner deliveries, vaguer answers and payment requests running ahead of visible progress, and act in the first weeks, not the last.

Source:Our guide “Reading a schedule”Our guide “Early warning signs of a stalling site”Checked 13 Oct 2026

In Kolkata, start in the dry months so the digging, foundations and plinth are done before the rains, which usually reach the city around 11 June (the India Meteorological Department’s normal onset date). Concrete can go on during the rains with care; an open excavation should not. Season Planner in our Lab sets your stages against the calendar.

Source:India Meteorological Department, normal monsoon onset datesSeason PlannerChecked 9 Oct 2026

Yes. We become the single point of accountability across them: one schedule, one weekly site meeting, one ledger, stage inspections and every running bill checked against the work before you pay. We work on your side as owner’s engineer, for an agreed fee.

Source:Delta StructuresChecked 13 Oct 2026

A small share of each payment, commonly about 5%, that you hold back and release only after the defect liability period, often 6 to 12 months after handover. It gives the contractor a reason to come back and fix what shows up in that time.

Source:Our guide “Retention money and the defect liability period”Checked 13 Oct 2026

The consultation and the preliminary estimate are free, usually within 48 hours*. An in-depth assessment and site visit is ₹2,499 across Kolkata (₹4,999 for the outskirts, on request), adjusted against the contract if you go ahead with us. A detailed BOQ is priced on request.

Source:Delta StructuresChecked 25 Nov 2026

WE’RE NEW · HERE IS HOW YOU CAN CHECK US

Start with a free preliminary estimate.

Tell us about the job and where it stands: not started, on site or stuck. The consultation and the preliminary estimate are free, usually within 48 hours*. An in-depth assessment and site visit is ₹2,499 (₹4,999 for the outskirts), adjusted against the contract if you go ahead with us.

Your requestA few lines. An engineer reads it.
What would you like?
Prefer the full estimate form, step by step? →

WhatsApp opens with your request ready. Nothing is sent until you press send there.Send by email

Monday to Saturday, 10am to 7pm IST.Free preliminary estimate, usually within 48 hours.*

Search or ask Delta