Skip to content
Delta Structures
EstimateFree estimate
08 · STRENGTHEN & PROTECT

Crack repair, column jacketing, corrosion treatment, seismic strengthening, underpinning and lifts for buildings already standing. Our engineers find out why a building is cracking, rusting or settling before anyone picks a repair.

*Indicative, not guaranteed. Timing varies with the complexity of your query.

23 SERVICES
Retrofitting
  • 01Seismic Retrofitting & Structural Strengthening
  • 02Crack Repair & Structural Rehabilitation
  • 03Waterproofing Retrofit for Chronic Leakage
  • 04Energy-Efficiency Retrofits
  • 05Fire Safety Compliance Retrofitting
  • +18 more inside
See all 23
HOW A RETROFIT MOVES
  1. Survey the building
  2. Test where it matters
  3. Name the cause
  4. Design the repair
  5. Prop, stop, repair
  6. Monitor and hand over
WHAT HAPPENS NEXT
  1. You tell us the jobA form, a WhatsApp message or a call.
  2. An engineer reviews itA free preliminary estimate, usually within 48 hours.*
  3. We visit and planA site visit (₹2,499, adjusted against the contract), then one plan and one contract.
HOW WE PRICE IT Assess first, then agree the price.
  • Item-rateUsual for retrofitting
  • Turnkey (lump sum)Once the report fixes the scope
  • Cost-plusWhen the damage is hidden
CHECK IT YOURSELF Three checks before our engineer visits. Crack DecoderIs this crack serious?2 MINSeismic ReadinessHow ready is your building for a quake?3 MINLift SizingAdding a lift? See the car, well and pit it needs.3 MIN
PRICING · NO SURPRISES

Our fees, before you ask.

Most jobs start free. Steps 2 and 3 are optional: take them when an engineer should see the site, or when you want every line priced.

  • No obligation
  • Each fee shown before you take the step
  • Fees come off your bill if you build with us
START HERE Usually 48 hours*

Free preliminary estimate

Best for: a first idea of the work and what it may cost.

Free
No obligation
YOU GETAn outline of the work and a rough cost range for the services you picked.
  • An engineer reads your request
  • From your form, photos or drawings
  • No site visit needed

Nothing in this step costs you anything.

OPTIONAL One visit

In-depth assessment and site visit

Best for: cracks in the walls, concrete flaking, rusty bars.

₹2,499/ visit
Across Kolkata · ₹4,999 for the outskirts, on request
YOU GETA written site assessment.
  • An engineer visits your site
  • An in-depth assessment of the site
  • Across Kolkata; the outskirts on request

Adjusted against the contract if you go ahead with us.

OPTIONAL A few business days

Detailed QTO & BOQ

Best for: a bank loan, or comparing contractors item by item.

On request
Quoted in writing before we start
YOU GETA line-by-line list of quantities and costs on our letterhead.
  • Every quantity counted from your drawings (QTO)
  • Every line priced (BOQ)
  • What banks accept for loans
  • Compare contractors item by item

Credited against your project bill if you build with us.

1 OF 3 · SWIPE

*Indicative, not guaranteed. Timing varies with the complexity of your query.The outskirts are the five areas we take on request.

FEES, PLAINLY

Questions about our fees

Because it needs no site visit. An engineer works from your form, photos and drawings, and sends an outline of the work and a rough cost range, usually within 48 hours.*

WHAT’S INCLUDED · 23 NAMED SERVICES

What we strengthen, repair and protect.

Each service is named in your quote, so you can see exactly what is in it. Tap one to see what happens on site.

1–4 of 23
Seismic Retrofitting & Structural StrengtheningDetailsColumn Jacketing & Beam StrengtheningDetailsCarbon-Fibre (FRP) StrengtheningDetailsFoundation UnderpinningDetailsStructural Health MonitoringDetailsVertical Extension: Adding a FloorDetailsCrack Repair & Structural RehabilitationDetailsCorrosion Treatment & Rebar PassivationDetailsAgeing Building Facade & Structural RepairDetailsBalcony & Cantilever StrengtheningDetailsExpansion Joint TreatmentDetailsParapet, Cornice & Chajja RepairDetailsRepairs After a Dangerous-Building NoticeDetailsWaterproofing Retrofit for Chronic LeakageDetailsRoof Load Upgrades for SolarDetailsRooftop Solar Structure & MountingDetailsEnergy-Efficiency RetrofitsDetailsRising Damp Treatment & Chemical DPCDetailsLeak & Damp InvestigationDetailsFire Safety Compliance RetrofittingDetailsAccessibility RetrofitsDetailsLift Installation & RetrofittingDetailsLightning Protection SystemsDetails
GROUP 01 / 04 · 6 SERVICESGROUP 02 / 04 · 7 SERVICESGROUP 03 / 04 · 6 SERVICESGROUP 04 / 04 · 4 SERVICES
Drag the orbit sideways, tap a group, or use ← →Swipe the orbit sideways, or tap a group
GROUP 01 / 04 · 6 SERVICES

Frame and foundations

  • We bring an older structure closer to the current earthquake code. Kolkata is in Seismic Zone III. We scope it after a structural assessment, with specialist partners where needed.

    ON SITEAn engineer checks the frame against IS 1893 and IS 15988: the ground storey, the columns and how walls, floors and roof are tied together. Strengthening is scoped only after that, with specialist partners where needed.

    Earthquake zones and what Zone III means for Kolkata →
  • We add strength to existing columns and beams with concrete or steel jackets, as designed.

    ON SITEThe column is propped and its surface prepared, then new steel and concrete, or a steel jacket, are added to the engineer’s design and tied into the beams and footing.

    Column jacketing: how a weak column is made strong again →
  • We fit high-strength wraps where space or downtime rules out jacketing. Delivered with specialist engineering partners, on assessment.

    ON SITEThe concrete is repaired and smoothed and the corners rounded, then carbon-fibre sheets are bonded on in the layers the design asks for, where a jacket would take too much room or time.

  • We strengthen or deepen the foundations under a standing building. Delivered with specialist engineering partners, on assessment.

    ON SITEAfter a soil investigation, the footing is extended or deepened in short sections, one at a time, so the building is never left unsupported.

    Underpinning: fixing a foundation that is failing →
  • We fit crack gauges and run periodic inspections for a building under watch.

    ON SITETell-tale gauges across key cracks, readings at set intervals and a short report each time, so you know whether a crack is still moving.

    Structural audit: when your old building needs one →
  • We check whether the frame and the foundation can carry another floor, strengthen what needs it, and build it once the plan is sanctioned.

    ON SITEAn engineer checks the drawings, the columns, the footings and the soil against the new load, and what the rules allow on your plot and road; strengthening is designed where it is needed, the extra floor’s plan is sanctioned, and only then is the new floor built.

GROUP 02 / 04 · 7 SERVICES

Cracks, rust and ageing concrete

  • We find the cause first, then repair: grouting, stitching or jacketing, as the engineering calls for.

    ON SITEEach crack is mapped and measured and its cause found and stopped; then it is injected, stitched or sealed to suit, and gauges show whether it moves again.

    Epoxy injection and crack stitching →
  • We stop the rust, treat the steel and restore the section, not just plaster over it.

    ON SITELoose concrete is cut back to clean steel, the bars cleaned and coated, badly thinned bars supplemented as the engineer directs, and the section rebuilt in polymer repair mortar.

    Why 40-year-old RCC fails →
  • We stop spalling, exposed steel and weathering before they spread.

    ON SITELoose plaster and concrete are sounded and cut back, rusting steel cleaned and treated, the section rebuilt, and cracks and joints sealed before the paint.

    Exposed steel and flaking concrete (spalling) →
  • We prop, jacket or add steel supports to an ageing balcony or cantilever.

    ON SITELoads come off first, the junction and the top steel are checked, then the cantilever is propped, jacketed or given steel supports.

    Ageing balconies: the cantilever warning signs →
  • We re-seal failed joints so the building can move without cracking.

    ON SITEThe old filler is raked out and the joint cleaned, then a flexible sealant or a joint cover goes in, so the building can move without cracking or leaking.

  • We repair or rebuild loose parapets, cornices and sunshades before a monsoon brings pieces down.

    ON SITELoose pieces are taken down from a safe position the same day; then the rusted steel or iron is cleaned and treated, the section is rebuilt or the member replaced, and a drip groove and a sealed top keep the rain out.

    Concrete flaking off, rusty bars showing? →
  • We assess the building, prepare the engineer’s repair scheme and carry it out, so you can answer the corporation’s notice with the work done.

    ON SITEThe building is surveyed and the urgent dangers made safe first (props, loose pieces down); then an engineer’s report names what must be repaired and in what order, and the repairs are carried out and recorded, so the owners have both the report and the work to show.

GROUP 03 / 04 · 6 SERVICES

Leaks, roofs and energy

  • We end the leak that has been 'fixed' five times, by treating the source, not the stain.

    ON SITEWe trace where the water gets in (roof, joint, pipe or wall), with a water test where needed, take off the failed layer and treat the source, not the stain.

    Where is the water really coming from? Damp Diagnoser →
  • We assess and strengthen your roof for solar panels and new services.

    ON SITEWe check what the slab and beams were built to carry against the panels, frames and wind, and strengthen them where they fall short.

    Will rooftop solar pay for itself? Solar Payback →
  • We engineer solar mounting that doesn't puncture your waterproofing.

    ON SITEFrames sit on ballast or pedestals bonded to the roof rather than bolted through the waterproofing, and are built for Kolkata’s wind (IS 875 Part 3, 50 m/s).

    Waterproofing an old roof, ranked honestly →
  • We add insulation and better glazing that cut the heat and your bills.

    ON SITERoof insulation or a reflective coat, shading and better glazing where most heat comes in, with the roof checked for any extra load first.

  • We inject a new damp-proof course at the base of the wall, cut back the salty plaster and replaster so the wall can dry.

    ON SITEThe source is confirmed first (rising damp, not a leak or condensation); then a row of holes along the mortar just above the floor takes the injected damp-proof course, the salty plaster comes off well above the tide mark, and the wall is replastered with a breathable or salt-resistant plaster once it has dried.

    Damp on your ground-floor walls? →
  • We trace where the water comes from with moisture readings, pipe pressure tests and water tests, before anything is broken open.

    ON SITEThe patch is mapped and timed (after rain, after a bath, all the time); then each part is tested on its own: the supply pipes under pressure, the drains one at a time, the floor by ponding, the outer wall by a hose test. You get the source in writing before any repair is priced.

    Bathroom leaking into the flat below? →
GROUP 04 / 04 · 4 SERVICES

Fire, access and lifts

  • We bring detection, escape routes and the electrical installation up to code.

    ON SITEAn electrical audit first, then smoke alarms, extinguishers on each floor and a clear escape route; larger buildings get the hydrants and alarms their fire licence asks for.

    Fire safety retrofits for older buildings →
  • We add ramps, railings and lift access, for ageing in place and for compliance.

    ON SITERamps at a gentle slope, grab bars and railings fixed into sound wall, wider doors where the wall allows and level thresholds where people trip.

  • We add lifts (elevators) to existing buildings after we check the structure.

    ON SITEThe well’s place is checked first: the foundations next to the pit and every slab or wall it cuts through. In an old building the well often goes outside, in a steel or concrete frame.

    Size the lift with Lift Sizing →
  • We design air terminals and earthing for tall or exposed buildings.

    ON SITEAir terminals, down conductors and earth pits laid out for the building’s height and shape, and tested once they are fixed.

A gloved hand shining a torch on a concrete column where the cover has spalled and the steel shows.
What an old structure needs, found before it is fixed.
STAGE BY STAGE · 6 STAGES

How a retrofit moves.

Skip the stages →
  1. Stage 01: Survey the building

    We walk it with you, map every crack, damp patch and rust stain, and ask when each one appeared.

  2. Stage 02: Test where it matters

    Cover, carbonation and strength tests show how sound the concrete is and how far the rust has reached.

  3. Stage 03: Name the cause

    Settling ground, a leak, overload or rusting steel: the report names the cause and ranks each repair by urgency.

  4. Stage 04: Design the repair

    Our engineer designs the fix (injection, jacketing, a wrap or underpinning) and the order of work.

  5. Stage 05: Prop, stop, repair

    Props hold the load where needed, the cause is stopped first, then each member is repaired or strengthened.

  6. Stage 06: Monitor and hand over

    Crack gauges and a check-back visit show the repair is holding; you keep the report, the photos and what to watch.

1 of 6
  1. Stage 01: Survey the building

    We walk it with you, map every crack, damp patch and rust stain, and ask when each one appeared.

  2. Stage 02: Test where it matters

    Cover, carbonation and strength tests show how sound the concrete is and how far the rust has reached.

  3. Stage 03: Name the cause

    Settling ground, a leak, overload or rusting steel: the report names the cause and ranks each repair by urgency.

  4. Stage 04: Design the repair

    Our engineer designs the fix (injection, jacketing, a wrap or underpinning) and the order of work.

  5. Stage 05: Prop, stop, repair

    Props hold the load where needed, the cause is stopped first, then each member is repaired or strengthened.

  6. Stage 06: Monitor and hand over

    Crack gauges and a check-back visit show the repair is holding; you keep the report, the photos and what to watch.

  1. Stage 01: Survey the building

    We walk it with you, map every crack, damp patch and rust stain, and ask when each one appeared.

  2. Stage 02: Test where it matters

    Cover, carbonation and strength tests show how sound the concrete is and how far the rust has reached.

  3. Stage 03: Name the cause

    Settling ground, a leak, overload or rusting steel: the report names the cause and ranks each repair by urgency.

  4. Stage 04: Design the repair

    Our engineer designs the fix (injection, jacketing, a wrap or underpinning) and the order of work.

  5. Stage 05: Prop, stop, repair

    Props hold the load where needed, the cause is stopped first, then each member is repaired or strengthened.

  6. Stage 06: Monitor and hand over

    Crack gauges and a check-back visit show the repair is holding; you keep the report, the photos and what to watch.

FREE CHECKS · FROM OUR LAB

Three checks before our engineer visits.

Whether a crack looks serious, how ready your building is for an earthquake, and what adding a lift would take. Each check takes a few minutes, and the result is yours to keep or send to us.

1 of 3
HOW YOU CAN CONTRACT WITH US

Assess first, then agree the price.

Nobody can price a repair before the cause is known, so a retrofit starts with an assessment. Once the report fixes the scope, item-rate or a fixed price can follow; where the damage is hidden, cost-plus keeps the books open.

1 of 3
PAY FOR WHAT’S MEASUREDUsual for retrofitting

Item-rate

You pay agreed rates for measured quantities: per square metre of tiling or plaster, per point of wiring, per running metre of pipe.

Price certainty
Flexibility
Transparency

Suits: Repairs measured as they are done: metres of crack injected, square metres of concrete repaired, columns jacketed.

Watch: The final cost follows the final quantities, so measurements must be recorded and agreed.

ONE AGREED PRICEOnce the report fixes the scope

Turnkey (lump sum)

One fixed price for a defined scope, worked out from complete drawings and specifications.

Price certainty
Flexibility
Transparency

Suits: A defined job from an engineer’s report, like jacketing named columns or building a new lift well.

Watch: Changes after signing become variations, so lock your decisions early.

OPEN BOOKWhen the damage is hidden

Cost-plus

You pay the actual cost of materials and labour, with the bills shared, plus an agreed fee.

Price certainty
Flexibility
Transparency

Suits: Old buildings where rusting steel and weak concrete show only once the plaster comes off.

Watch: The total isn’t fixed, so it works best with clear records and regular reviews.

PAY FOR WHAT’S MEASUREDUsual for retrofitting

Item-rate

You pay agreed rates for measured quantities: per square metre of tiling or plaster, per point of wiring, per running metre of pipe.

Price certainty
Flexibility
Transparency

Suits: Repairs measured as they are done: metres of crack injected, square metres of concrete repaired, columns jacketed.

Watch: The final cost follows the final quantities, so measurements must be recorded and agreed.

ONE AGREED PRICEOnce the report fixes the scope

Turnkey (lump sum)

One fixed price for a defined scope, worked out from complete drawings and specifications.

Price certainty
Flexibility
Transparency

Suits: A defined job from an engineer’s report, like jacketing named columns or building a new lift well.

Watch: Changes after signing become variations, so lock your decisions early.

OPEN BOOKWhen the damage is hidden

Cost-plus

You pay the actual cost of materials and labour, with the bills shared, plus an agreed fee.

Price certainty
Flexibility
Transparency

Suits: Old buildings where rusting steel and weak concrete show only once the plaster comes off.

Watch: The total isn’t fixed, so it works best with clear records and regular reviews.

WORKING NEAR YOU · 20 AREA GUIDES

Every locality has its own rules and ground.

Pick your area to see who approves alterations and what the ground is like. Soft, filled or wet ground is behind many of the cracks we are called to; the area guide says what lies under yours.

Garia, Patuli, Mukundapur & AjoynagarJadavpur, Baghajatin & SantoshpurTollygunge, Regent Park, Bansdroni, Naktala & HaridevpurBehala, Thakurpukur & JokaKasba, EM Bypass, Kalikapur, Anandapur, Picnic Garden & TiljalaBallygunge, Alipore, Bhowanipore & KalighatLake Gardens, Golf Green, Dhakuria & SelimpurGarden Reach, Maheshtala & Budge BudgeSonarpur, Narendrapur, Harinavi, Subhashgram, Mallickpur & ChampahatiRajpur, Baruipur & KamalgaziBishnupur, Amtala & Diamond HarbourCentral Kolkata: Park Street, Esplanade, Sealdah, Entally & BeliaghataNorth Kolkata: Shyambazar, Bagbazar, Shobhabazar, Maniktala, Ultadanga, Phoolbagan & KankurgachiBaranagar, Sinthi, Belgharia, Dum Dum, Nagerbazar & BiratiSalt Lake, Lake Town & Bangur AvenueNew Town, Rajarhat, Kestopur, Baguiati, Teghoria, Kaikhali & Chinar ParkMadhyamgram & BarasatSodepur, Agarpara, Khardah, Titagarh & BarrackporeHowrah, Shibpur, Santragachi, Liluah, Bally, Andul, Domjur & UluberiaHooghly: Dankuni, Uttarpara, Serampore & Chandannagar

WHO APPROVES ALTERATIONSGaria is split between Kolkata Municipal Corporation and Rajpur Sonarpur Municipality.The cluster is within Kolkata Municipal Corporation, split across Boroughs X, XI and XII.The cluster is within Kolkata Municipal Corporation, across Boroughs X, XI and XIII.Behala is within Kolkata Municipal Corporation, across Boroughs XIII, XIV and XVI.The cluster is within Kolkata Municipal Corporation, across four boroughs.The cluster is within Kolkata Municipal Corporation, across Boroughs VIII, IX and X.Every ward in the cluster is in Kolkata Municipal Corporation’s Borough X.Three civic bodies share the cluster.Most of the cluster is in Rajpur Sonarpur Municipality, one of the state’s oldest.Two municipalities and the gram panchayats around them.One municipality, then gram panchayats.All of it is Kolkata Municipal Corporation, across four boroughs.All of it is Kolkata Municipal Corporation, across three boroughs.Six civic bodies: one corporation and five municipalities.Three bodies: the corporation, the IT township authority and a municipality.NKDA inside New Town, the municipal corporation along VIP Road.Two municipalities, then gram panchayats.Four municipalities and a cantonment board.A corporation, two municipalities, then gram panchayats.A corporation and six municipalities.

THE GROUNDMuch of Patuli is urbanised wetland on clayey, alluvial soil.Santoshpur was shallow marsh and farmland until the 1970s.Much of the cluster was forest, swamp and ponds not long ago.Behala was once part of the Sundarbans, and parts of it are filled marsh.Much of the Bypass side was wetland until the 1980s.The lake was dug out of marsh, and Kalighat sits on the old river course.Low, flat land between a lake and a golf course, and heavy monsoon bursts.Low delta land on the east bank of the Hooghly.Flat delta land along the silted course of the Adi Ganga.The Baruipur–Jaynagar plain, laid down by the old river.Low river plain, and arsenic in some groundwater.Old fill over soft, water-bearing ground.Old riverside ground in the west, reclaimed salt marsh in the east.Riverbank mills and ghats in the west, slightly higher ground at Dum Dum.Salt Lake is reclaimed marsh, filled with river silt.New Town was built on farmland and water bodies.Flat delta land, just above flood level.Riverside delta land, with arsenic in some groundwater.Low, wet ground: Howrah is named after a marsh.The Hooghly rises every monsoon, so riverside plots need flood-aware plinth levels and drainage. The area guide has the details.

Open the GariaJadavpurTollygungeBehalaKasbaBallygungeLake GardensGarden ReachSonarpurBaruipurDiamond HarbourCentral KolkataNorth KolkataBaranagar & Dum DumSalt Lake & Lake TownNew Town & RajarhatMadhyamgram & BarasatSodepur to BarrackporeHowrahHooghly riverside guide →
KNOWLEDGE HUB · CALCULATORS

Read up before you repair.

GUIDE · 16 MINStructural crack vs shrinkage crackGUIDE · 9 MINStructural audit: when your old building needs oneGUIDE · 9 MINEpoxy injection & crack stitching: how real crack repair worksGUIDE · 12 MINExposed steel & flaking concrete (spalling)GUIDE · 9 MINColumn jacketing: how a weak column is made strong againGUIDE · 12 MINEarthquake zones & what Zone III means for KolkataGUIDE · 9 MINWhy 40-year-old RCC fails: carbonation, chlorides and rusting rebarGUIDE · 7 MINIs my building earthquake-ready? A Zone III self-checkGUIDE · 10 MINAging balconies: the cantilever warning signsGUIDE · 9 MINUnderpinning: fixing a foundation that's already failingGUIDE · 13 MINFire safety retrofits for older buildingsGUIDE · 18 MINRising damp vs leakage vs condensation
1 of 12
1–2 of 6

OFTEN PAIRED WITH

ASK DELTA · ENGLISH · বাংলা · हिंदी

Ask Delta anything.

Cracks, spalling, jacketing, earthquake readiness and structural audits, answered from our published guides.

Questions about retrofitting with us

Fine cracks under about 1 mm, random or in a map pattern and only in the plaster, are usually shrinkage and cosmetic. Cracks 3 mm or wider, or with a clear direction (diagonal from a window corner, long and horizontal, stepped through the brick joints), cracks that pass through the wall and cracks that keep growing may be structural and need an engineer to look. Crack Decoder in our Lab takes you through the signs.

Source:Our guide “Structural crack vs shrinkage crack”Crack DecoderChecked 13 Oct 2026

Not until we know why it opened. Filling a crack whose cause is still active (a settling footing, an overloaded beam, rusting steel) leaves a neat line that reopens beside the repair. We find the cause and stop it, then inject, stitch or seal the crack to suit, and fix gauges to check it stays closed.

Source:Our guide “Epoxy injection and crack stitching”Checked 13 Oct 2026

Kolkata is in Seismic Zone III, moderate hazard, under IS 1893 (Part 1):2016, and its soft alluvial soil can amplify shaking. Buildings designed and detailed to the code allow for this. The ones to check are old load-bearing brick buildings, buildings with an open ground floor for shops or parking, and buildings whose walls or columns have been cut over the years. IS 15988 sets out how an existing concrete building is evaluated and strengthened.

Source:IS 1893 (Part 1):2016IS 15988Our guide “Earthquake zones and what Zone III means for Kolkata”Checked 8 Oct 2026

Don’t wait for a date if you see the signs: cracks in columns or beams, rust stains or exposed steel, sagging floors, or doors and windows jamming across the building. Get one before you buy an old building, renovate it heavily or add a floor, too. The audit grades the structure, names what is wrong and lists the repairs by urgency.

Source:Our guide “Structural audit: when your old building needs one”Checked 13 Oct 2026

Yes. A column can be jacketed: wrapped in new steel and concrete, or in a steel jacket, tied into the beams and the footing. Where a jacket would take too much room or time, carbon-fibre (FRP) wraps can do the job. How big the jacket is and how it joins the old column come from a structural engineer’s design, never a mason’s guess.

Source:Our guide “Column jacketing”Checked 13 Oct 2026

Often, yes. The well usually goes outside the walls in a steel or concrete frame, and an engineer first checks the foundations next to the pit and every slab or wall the well cuts through. In West Bengal a lift needs the government’s permission and a licence to work under the West Bengal Lifts, Escalators and Travelators Act, 2019, and an inspection at least once every five years. In a block of flats, adding a structure like a lift well needs the written consent of all the owners under section 7 of the West Bengal Apartment Ownership Act, 1972.

Source:West Bengal Lifts, Escalators and Travelators Act, 2019West Bengal Apartment Ownership Act, 1972 (section 7)Lift SizingChecked 13 Oct 2026

The consultation and the preliminary estimate are free, usually within 48 hours*. An in-depth assessment and site visit is ₹2,499 across Kolkata (₹4,999 for the outskirts, on request), adjusted against the contract if you go ahead with us. A detailed BOQ is priced on request.

Source:Delta StructuresChecked 25 Nov 2026

WE’RE NEW · HERE IS HOW YOU CAN CHECK US

Start with a free preliminary estimate.

Send us photos of the cracks, rust or damp and tell us how old the building is. The consultation and the preliminary estimate are free, usually within 48 hours*. An in-depth assessment and site visit is ₹2,499 (₹4,999 for the outskirts), adjusted against the contract if you go ahead with us.

Your requestA few lines. An engineer reads it.
What would you like?
Prefer the full estimate form, step by step? →

WhatsApp opens with your request ready. Nothing is sent until you press send there.Send by email

Monday to Saturday, 10am to 7pm IST.Free preliminary estimate, usually within 48 hours.*

Search or ask Delta