Excavation & Earthwork Estimator
Footprint & depth → soil volume, trips
Category: Civil & concrete
What you enter
- Footprint length (ft)
- Footprint width (ft)
- Depth (ft)
- Soil type: Soft / loose (20% swell), Medium / clayey (30%), Hard / murrum (40%)
An example
With the starting values (Footprint length (ft): 40; Footprint width (ft): 30; Depth (ft): 4; Soil type: Soft / loose (20% swell)), it gives:
- In-situ dig volume: 4,800 cft (135.8 m³)
- Loose spoil to cart: 5,760 cft
- Tipper trips (~300 cft): 20 loads
Good to know
Excavated earth 'swells' 20–40% once loosened, so you cart away more than you dig. Trip count assumes a standard 8–9 m³ tipper. Deep or waterlogged pits need shoring and dewatering — price those separately.
Sources
- Our site practice
Checked 7 Oct 2026, pending our team’s sign-off.
Read the guide
Free, instant and indicative: a starting point for our engineers’ estimate, not a substitute for one.