Delta Structures

UPVC, CPVC, PPR or GI — which pipe goes where

Cold water lines: UPVC or PPR. Hot water: CPVC or PPR (UPVC softens). Soil and waste: SWR-grade UPVC. GI (galvanised iron) survives sun and mechanical abuse but corrodes internally over decades and is now mostly for exposed external runs. Matching pipe class to pressure — not just material to temperature — is the step most sites skip.

Pipes are like tyres: the material matters, but the rating printed on the side matters more. A correct material in the wrong pressure class fails just as wet.

The pipes in a house are hidden in walls, floors and shafts within weeks of being laid, and are expected to work for decades. Choosing the right pipe for each line, and the right class of that pipe for its pressure and temperature, is one of the least visible decisions in a build and one of the most expensive to get wrong: a failure inside a wall means breaking tiles, plaster and waterproofing to reach it.

This guide explains the common pipe materials and their standards, which pipe suits which line, pressure classes and why they matter, hot water lines, drainage and its slopes, joints and fittings, testing before walls close, the delivery checks, and what is different in Kolkata. Our Plumbing Pipe Sizer helps size the pipes, and our bathroom fittings guide covers what goes on the end of them.

The common materials

PipeWhat it isStandard
uPVC pressure pipeRigid unplasticised PVC, for cold water under pressureIS 4985
CPVCChlorinated PVC, for hot and cold waterIS 15778
PPRPolypropylene random copolymer, joined by heat fusion, for hot and cold waterIS 15801
SWR uPVCuPVC pipes and fittings for soil, waste and rainwaterIS 13592
HDPEFlexible polyethylene, for underground supply linesIS 4984
GIGalvanised steel, for exposed runs and some risersIS 1239

Which pipe goes where

LineCommon choicesWatch for
Cold water supply, concealeduPVC pressure pipe, CPVC or PPRThe pressure class printed on the pipe; full solvent or fusion joints
Hot water from geysers and solar heatersCPVC or PPR rated for hot waterNever ordinary uPVC, which softens with heat
Soil and waste from WCs, basins and floor trapsSWR uPVCSlopes, cleaning points, vents
Rainwater pipesSWR uPVC, or UV-stabilised pipe outdoorsFixing clear of the wall, joints sealed
Underground supply from the main or the sumpHDPE or uPVC of the right classDepth, protection from traffic loads
Exposed runs on roofs and outside wallsUV-stabilised pipe, or GI where knocks are likelySunlight on unprotected plastic; rust on GI

Pressure classes

Pipes are made in classes or standard dimension ratios that set the pressure they can carry at a given temperature. The class, the size and the standard are printed along every length of a good pipe. A thin-walled pipe of the right material in the wrong class can burst under a pressure pump, or creep and fail at the joints over time.

In a gravity-fed house, pressure is set by the height of the roof tank above each tap, about one bar for every ten metres. A pressure pump, a tall building or a direct connection to a pressurised main raises it. Ask the plumber or engineer what pressure each line will see, and choose the class to suit it, with a margin, as the pipe maker's tables show.

Hot water lines

  • Use pipe rated for hot water at the temperature the geyser or solar heater can deliver, typically CPVC or PPR.
  • Keep hot pipes short, and insulate long runs, so hot water arrives quickly and less heat is lost.
  • Allow for expansion: hot pipes grow in length, so long runs need room to move or expansion loops.
  • Fit a non-return valve and the safety valve the geyser maker asks for.
  • Keep CPVC and other plastic hot water pipes out of direct sunlight, which makes them brittle over time.

Drainage and its slopes

Drains work by gravity, so their slope matters as much as their size. Too flat, and solids settle and block the pipe; too steep, and the water runs ahead and leaves the solids behind. Typical slopes for house drains are about 1 in 40 to 1 in 60 for 100 mm soil pipes, with smaller waste pipes a little steeper, as the National Building Code of 2016 described.

Every drainage system needs vents, so that water rushing down does not suck the water out of the traps and let sewer smells into the rooms. It needs cleaning eyes or access points at bends and junctions, so blockages can be cleared without breaking anything. And it needs traps at every fitting, with their water seals kept full.

Joints and fittings

  • Use fittings from the same maker and system as the pipe; mixing brands is where joints weep.
  • uPVC and CPVC are solvent-welded with the cement made for each; the two cements are not interchangeable.
  • Cut pipes square, remove the burrs, clean and dry the ends, apply the cement to both parts and push fully home.
  • PPR is joined by heat fusion with the right tool and temperature; underheated joints leak and overheated ones narrow the bore.
  • Use proper transition fittings where plastic meets metal, such as at a tap or a geyser.
  • Avoid joining GI directly to copper or brass without the right fitting, which can corrode at the joint.
  • Support pipes with clamps at the spacing the maker gives.

Testing before the walls close

  1. Fill the supply lines and bleed out the air.
  2. Pressurise them with a hand test pump to about one and a half times the working pressure, or as the specification or maker sets.
  3. Hold the pressure for the time the specification sets, commonly a day for concealed work, and watch the gauge.
  4. Walk every line and joint looking for drips, with the walls still open.
  5. Test the drains by filling them with water up to a set level, or by running water through each fitting, and checking every joint.
  6. Fix any leak and test again; record the test with the date and the pressures.
  7. Close the walls and floors only after the tests pass.

A pressure test costs an hour. A leak found after tiling costs a wall.

Delivery checks

  • The ISI mark, the maker's name, the standard, the size and the class printed along every length.
  • No unmarked or loose pipe for concealed work.
  • Fittings and solvent cement from the same system as the pipe.
  • Pipes straight, undamaged and of even colour, with no cracks at the ends.
  • Pipes stored out of the sun, supported along their length, and kept clean inside.
Large PVC pipes strapped on a lorry (United States): check every length's markings and ends before they come off.
Large PVC pipes strapped on a lorry (United States): check every length's markings and ends before they come off.. Photo: Shah Rahman, Public domain, via Wikimedia Commons

In Kolkata

Most homes are fed from a roof tank by gravity, so pressure is low on the top floors and higher further down; pressure pumps are common and change the class of pipe needed. Borewell water in many areas is hard or carries iron, which scales and stains, and favours plastic pipes over GI inside the house. Old houses often still have GI pipes that have rusted inside over decades, narrowing the bore and leaking at the joints; replacing them is usually part of any bathroom or kitchen renovation. Roof runs face strong sun, so plastic pipes on terraces should be UV-stabilised, painted or covered.

The cheat sheet

LineRight choiceWatch for
Cold supply, concealedUPVC (ASTM/Sch 40) or PPRPressure class printed on pipe; joints solvent-welded fully, not tack-glued
Hot supplyCPVC (SDR 11) or PPR greenCPVC turns brittle in continuous sunlight — never on open terraces
Soil / waste / ventSWR UPVC, ring-fit or solventSlope: 1:40 to 1:60 for 100mm lines; steeper is not better (solids strand)
Exposed external / riserGI class B, or UV-stabilised UPVCGI + copper fittings = galvanic corrosion at the joint

Delivery-day checks

  • ISI mark and class printed along the pipe length — reject unmarked 'commercial' pipe for concealed work.
  • Fittings from the same brand/system as the pipe; mixed systems are where joints weep.
  • Solvent cement fresh and of the matching type (UPVC and CPVC cements are not interchangeable).

Questions people ask

Can uPVC be used for hot water?

No. Ordinary uPVC softens with heat. Use CPVC or PPR rated for hot water.

Which is better, CPVC or PPR?

Both work well for hot and cold water when made to their standards and joined properly. CPVC is solvent-welded; PPR is heat-fused. Choose one system and stay with its fittings.

What slope should a drain have?

Typically about 1 in 40 to 1 in 60 for 100 mm soil pipes, as the National Building Code of 2016 described. Too flat and solids settle; too steep and they are left behind.

How should concealed pipes be tested?

Pressurise them to about one and a half times the working pressure, hold it for the time the specification sets, commonly a day, and check every joint before the walls close.

Should old GI pipes be replaced?

Usually yes, during any bathroom or kitchen renovation. Old GI rusts inside, narrows and leaks at the joints.

Do plastic pipes on the roof need protection?

Yes. Sunlight makes many plastics brittle. Use UV-stabilised pipe, or paint or cover exposed runs.

Red flags

  • UPVC used on a geyser's hot line
  • No pressure test before walls are closed
  • Unbranded pipe delivered loose without markings

Pro tip

Insist on a pressure test (typically 1.5× working pressure held for 24 hours) on every concealed circuit before tiling — after tiles, every fix is demolition.

Work it out: Plumbing Pipe Sizer

Sources

  1. IS 4985 uPVC Pipes for Water Supply, IS 15778 CPVC Pipes, IS 15801 PPR Pipes (Bureau of Indian Standards) (checked 15 Nov 2026)
  2. IS 13592 uPVC Pipes for Soil and Waste Discharge Systems, and IS 1239 Steel Tubes (Bureau of Indian Standards) (checked 15 Nov 2026)
  3. National Building Code of India 2016, Part 9 Plumbing Services (Bureau of Indian Standards) (withdrawn by BIS on 30 April 2026; replaced by the National Building Construction Standards 2026, SP 7:2026) (checked 15 Nov 2026)

Checked against these sources on the dates shown, pending our team’s sign-off.

Skip to content
KNOWLEDGE HUB · {{ nAll }} FREE FIELD GUIDES

Know before you build.

Plain-language guides from our engineering desk. No jargon without a translation and no scare tactics, just the checks and rules of thumb professionals use on site, so you can talk to any contractor, including us, as an informed client.

{{ readLine }}

{{ countTxt }}

Loading the guides
We couldn’t load the guides.The connection may have dropped. Try again, or ask Delta below: its answers come from the same guides.
No guides match “{{ q }}”.Try a broader word such as damp, cement or RERA, or ask Delta below.
DID YOU KNOW · {{ factNo }}

{{ fact }}

These guides describe standard Indian construction practice and field checks aligned with IS codes, such as IS 456 for concrete, IS 383 for aggregates and IS 1893 for seismic zoning. They are general education. Every building is different, so treat anything structural as a reason for an on-site professional assessment, not a do-it-yourself diagnosis.

Ready to plan your own build?

Five taps give you a cost range, a season plan and your area’s rules. Or send us your plot for a free preliminary estimate, usually within 48 hours.*

Start your free estimate →Plan your build in five tapsTalk on WhatsApp

*Indicative, not guaranteed. Timing varies with the complexity of your query.

{{ g.dom }}· {{ g.mins }} MIN READ
{{ g.trNote }}

{{ g.title }}

{{ g.imgAlt }}
Photo: {{ g.imgBy }}, {{ g.imgLic }}, via Wikimedia Commons
THE SHORT ANSWER

{{ s.t }}{{ s.t }}

IN PLAIN WORDS

{{ s.t }}{{ s.t }}

{{ g.dNote }}

{{ s.t }}{{ s.t }}

{{ x.h }}

{{ s.t }}{{ s.t }}

  • {{ s.t }}{{ s.t }}
  1. {{ st.n }}{{ s.t }}{{ s.t }}
{{ r.label }}{{ c.k }}{{ c.v }}
{{ fg.alt }}
Photo: {{ fg.by }}, {{ fg.lic }}, via Wikimedia Commons

{{ x.h }}

{{ s.t }}{{ s.t }}

  • {{ s.t }}{{ s.t }}
  1. {{ st.n }}{{ s.t }}{{ s.t }}
{{ r.label }}{{ c.k }}{{ c.v }}

{{ g.faqT }}

{{ f.q }}

{{ s.t }}{{ s.t }}

RED FLAGS ON SITE
  • {{ s.t }}{{ s.t }}
PRO TIP

{{ s.t }}{{ s.t }}

SEEING THIS AT HOME?{{ g.probT }}Tick what you see and we tell you what it most likely means, with the fixes ranked honestly.Check yours → {{ g.goKick }}{{ g.goName }}{{ g.goDesc }}{{ g.goCta }} PLAY · ONE MINUTE{{ g.playName }}{{ g.playLine }}Play the game →
Ask our engineers on WhatsApp
{{ g.srcHead }}
  1. {{ s.l }}{{ s.chk }}

Checked against these sources on the dates shown, pending our team’s sign-off. Rules change, so we check them again for your plot before anything is filed.